X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144061406000

Well Details

Well ID: 0144061406000
Loading map...
Location: 00/06-14-014-06W4/0
Location Alias: 00/06-14-14-06 W4M
Location Alias 2: 00/06-14-014-06 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 06
Section: 14
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-14-14-6
Operator Name: Canlin Energy Corporation
License Number: 0053982
License Date: 1975-06-23
License Status: Issued
Spud Date: 1976-06-09
Final Drill Date: 1976-06-11
Well Total Depth: 414.80 m
Surface Hole Latitude: 50.171364
Surface Hole Longitude: -110.721876

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-23 Obtained License
1976-06-11 Finished Drilling
1976-06-11 Production Casing Operation Performed
1976-06-11 Well Mode changed to Drilled and Cased
1976-06-24 Perforation Treatment Performed - Jet Perforation
1976-06-29 Perforation Treatment Performed - Fractured
1976-08-24 Perforation Treatment Performed - Fractured
1976-08-24 Perforation Treatment Performed - Selective Bullet Perforations
1976-09-01 Well Began Production
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-24 Perforation 363.00 363.90 7
1976-08-24 Selective Bullet Perforations 283.50 302.10 0
1976-08-24 Selective Bullet Perforations 303.00 303.90 0
1976-08-24 Selective Bullet Perforations 309.70 313.00 0
1976-08-24 Selective Bullet Perforations 315.80 319.10 0
1976-08-24 Fracture 264.90 319.10 0
1976-06-24 Perforation 370.30 371.90 7
1976-06-24 Perforation 394.40 396.20 7
1976-06-24 Perforation 400.50 401.40 3
1976-06-29 Fracture 363.00 401.40 0
1976-08-24 Selective Bullet Perforations 264.90 265.80 0
1976-08-24 Selective Bullet Perforations 268.50 272.80 0
1976-08-24 Selective Bullet Perforations 273.70 274.60 0
1976-08-24 Selective Bullet Perforations 277.40 278.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2354 0.0 0.0 0.0
1977 8184 0.0 0.0 0.0
1978 7880 0.0 0.0 0.0
1979 8754 0.0 0.0 0.0
1980 7214 0.0 0.0 0.0
1981 4033 0.0 0.0 0.0
1982 7855 0.0 0.0 0.0
1983 8728 0.0 0.0 0.0
1984 8056 0.0 0.0 0.0
1985 8673 0.0 0.0 0.0
1986 7027 0.0 0.0 0.0
1987 8430 0.0 0.0 0.0
1988 8763 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8121 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8740 0.0 0.0 0.0
1998 8732 0.0 0.0 0.0
1999 8757 0.0 0.0 0.0
2000 8776 0.0 0.0 0.0
2001 8727 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8711 0.0 0.0 0.0
2004 8399 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8380 0.0 0.0 0.0
2007 8559 0.0 0.0 0.0
2008 8722 0.0 0.0 0.0
2009 8462 0.0 0.0 0.0
2010 7944 0.0 0.0 0.0
2011 8639 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References