X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144051706000

Well Details

Well ID: 0144051706000
Loading map...
Location: 00/06-17-014-05W4/0
Location Alias: 00/06-17-14-05 W4M
Location Alias 2: 00/06-17-014-05 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 05
Section: 17
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-17-14-5
Operator Name: Canlin Energy Corporation
License Number: 0056047
License Date: 1975-12-02
License Status: Issued
Spud Date: 1975-12-19
Final Drill Date: 1975-12-20
Well Total Depth: 416.10 m
Surface Hole Latitude: 50.171399
Surface Hole Longitude: -110.657989

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-02 Obtained License
1975-12-20 Finished Drilling
1975-12-20 Production Casing Operation Performed
1975-12-20 Well Mode changed to Drilled and Cased
1976-03-15 Perforation Treatment Performed - Jet Perforation
1976-03-15 Perforation Treatment Performed - Selective Jet Perforations
1976-03-22 Perforation Treatment Performed - Fractured
1976-04-27 Perforation Treatment Performed - Selective Jet Perforations
1976-04-27 Well Log Performed
1976-04-28 Perforation Treatment Performed - Fractured
1976-07-10 Well Began Production
1976-07-10 Well Fluid changed to Gas
1976-07-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-15 Perforation 384.40 385.90 7
1976-04-27 Selective Jet Perforations 299.60 300.20 0
1976-04-27 Selective Jet Perforations 303.60 305.70 0
1976-04-27 Selective Jet Perforations 315.50 315.50 0
1976-04-28 Fracture 256.30 315.50 0
1976-03-15 Selective Jet Perforations 390.10 391.40 0
1976-03-15 Selective Jet Perforations 392.00 392.00 0
1976-03-22 Fracture 384.40 392.00 0
1976-04-27 Selective Jet Perforations 256.30 257.60 0
1976-04-27 Selective Jet Perforations 264.00 265.50 0
1976-04-27 Selective Jet Perforations 269.70 278.60 0
1976-04-27 Selective Jet Perforations 287.40 292.30 0
1976-04-27 Selective Jet Perforations 292.90 294.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4151 0.0 0.0 0.0
1977 8562 0.0 0.0 0.0
1978 7885 0.0 0.0 0.0
1979 8557 0.0 0.0 0.0
1980 7224 0.0 0.0 0.0
1981 4039 0.0 0.0 0.0
1982 8169 0.0 0.0 0.0
1983 8585 0.0 0.0 0.0
1984 7659 0.0 0.0 0.0
1985 7996 0.0 0.0 0.0
1986 6724 0.0 0.0 0.0
1987 8659 0.0 0.0 0.0
1988 8767 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8683 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8727 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8713 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8577 0.0 0.0 0.0
2004 8519 0.0 0.0 0.0
2005 8715 0.0 0.0 0.0
2006 8599 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References