X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144040506000

Well Details

Well ID: 0144040506000
Loading map...
Location: 00/06-05-014-04W4/0
Location Alias: 00/06-05-14-04 W4M
Location Alias 2: 00/06-05-014-04 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 04
Section: 05
County/Municipality: Cypress County
Well Name: MEDICINE HAT NO. 97
Operator Name: City Of Medicine Hat
License Number: 0008104
License Date: 1954-06-09
License Status: Issued
Spud Date: 1954-06-23
Final Drill Date: 1954-06-27
Well Total Depth: 442.60 m
Surface Hole Latitude: 50.142285
Surface Hole Longitude: -110.517179

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-09 Obtained License
1954-06-27 Finished Drilling
1954-06-27 Perforation Treatment Performed - Open-Hole Completion
1954-06-27 Production Casing Operation Performed
1954-06-27 Well Mode changed to Drilled and Cased
1954-12-01 Well Began Production
1954-12-01 Well Fluid changed to Gas
1954-12-01 Well Mode changed to Flowing
1978-07-21 Perforation Treatment Performed - Cement Squeeze
1978-07-21 Perforation Treatment Performed - Jet Perforation
1978-07-26 Perforation Treatment Performed - Cement Squeeze
1978-09-28 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-07 Perforation Treatment Performed - Fractured
1978-11-02 Perforation Treatment Performed - Selective Bullet Perforations
1978-11-10 Perforation Treatment Performed - Fractured
1978-12-15 Well Fluid changed to Gas
1978-12-15 Well Mode changed to Flowing
1993-10-16 Perforation Treatment Performed - Jet Perforation
1993-10-26 Perforation Treatment Performed - Fractured
1993-11-19 Well Fluid changed to Gas
1993-11-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-06-27 Open Hole/Barefoot Completion 375.50 396.80 0
1978-09-28 Selective Bullet Perforations 415.00 415.40 0
1978-09-28 Selective Bullet Perforations 416.00 417.00 0
1978-09-28 Selective Bullet Perforations 417.50 419.20 0
1978-09-28 Selective Bullet Perforations 419.60 420.10 0
1978-09-28 Selective Bullet Perforations 420.60 421.20 0
1978-09-28 Selective Bullet Perforations 422.20 422.50 0
1978-09-28 Selective Bullet Perforations 423.00 424.10 0
1978-10-06 Acid Treatment 390.00 424.10 0
1978-10-07 Fracture 390.00 424.10 0
1978-11-02 Selective Bullet Perforations 376.50 377.00 0
1978-07-21 Perforation 256.90 257.20 15
1978-11-02 Selective Bullet Perforations 377.50 378.00 0
1978-11-02 Selective Bullet Perforations 378.50 379.00 0
1978-11-02 Selective Bullet Perforations 380.00 380.50 0
1978-11-02 Selective Bullet Perforations 381.00 381.50 0
1978-11-02 Selective Bullet Perforations 382.00 382.50 0
1978-11-02 Selective Bullet Perforations 383.00 383.00 0
1978-11-10 Fracture 376.50 383.00 0
1993-10-16 Perforation 284.40 286.00 4
1993-10-16 Perforation 290.00 291.00 4
1993-10-16 Perforation 291.80 293.20 4
1978-07-21 Cement Squeeze 256.90 257.20 0
1993-10-16 Perforation 293.70 294.40 4
1993-10-16 Perforation 296.50 300.70 4
1993-10-16 Perforation 304.00 306.00 4
1993-10-16 Perforation 308.00 311.00 4
1993-10-16 Perforation 314.90 315.90 4
1993-10-16 Perforation 318.00 320.60 4
1993-10-16 Perforation 326.20 329.00 4
1993-10-16 Perforation 329.50 330.30 4
1993-10-16 Perforation 332.10 335.80 4
1993-10-16 Perforation 338.80 340.60 4
1978-07-26 Cement Squeeze 375.50 396.80 0
1993-10-16 Perforation 342.50 343.90 4
1993-10-26 Fracture 284.40 343.90 0
1978-09-28 Selective Bullet Perforations 390.00 390.50 0
1978-09-28 Selective Bullet Perforations 391.00 391.50 0
1978-09-28 Selective Bullet Perforations 391.70 392.60 0
1978-09-28 Selective Bullet Perforations 393.00 396.30 0
1978-09-28 Selective Bullet Perforations 413.60 414.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 5571 0.0 0.0 0.0
1970 8711 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8495 0.0 0.0 0.0
1973 8591 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 8759 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8592 0.0 0.0 0.0
1978 4703 0.0 0.0 0.0
1979 6071 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 8087 0.0 0.0 0.0
1982 6239 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 7655 0.0 0.0 0.0
1985 7175 0.0 0.0 0.0
1986 8735 0.0 0.0 0.0
1987 8447 0.0 0.0 0.0
1988 7970 0.0 0.0 0.0
1989 8221 0.0 0.0 0.0
1990 7816 0.0 0.0 0.0
1991 8735 0.0 0.0 0.0
1992 7046 0.0 0.0 0.0
1993 7727 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8664 0.0 0.0 0.0
1996 8732 0.0 0.0 0.0
1997 8745 0.0 0.0 0.0
1998 8734 0.0 0.0 0.0
1999 8740 0.0 0.0 0.0
2000 8782 0.0 0.0 0.0
2001 8746 0.0 0.0 0.0
2002 8751 0.0 0.0 0.0
2003 8748 0.0 0.0 0.0
2004 8782 0.0 0.0 0.0
2005 8756 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8727 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8727 0.0 0.0 0.0
2010 8753 0.0 0.0 0.0
2011 8729 0.0 0.0 0.0
2012 8399 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8634 0.0 0.0 0.0
2015 8520 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 4179 0.0 0.0 0.0
2020 336 0.0 0.0 0.0

For data sources see[5]

References