X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144040308022

Well Details

Well ID: 0144040308022
Loading map...
Location: 02/08-03-014-04W4/2
Location Alias: 02/08-03-14-04 W4M
Location Alias 2: 02/08-03-014-04 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 04
Section: 03
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 8-3-14-4
Operator Name: Pine Cliff Energy Ltd.
License Number: 0079030
License Date: 1979-11-02
License Status: Issued
Spud Date: 1979-11-18
Final Drill Date: 1979-11-20
Well Total Depth: 801.00 m
Surface Hole Latitude: 50.141754
Surface Hole Longitude: -110.465023

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-02 Obtained License
1979-11-20 Finished Drilling
1979-11-20 Production Casing Operation Performed
1979-11-20 Well Mode changed to Drilled and Cased
1979-12-28 Perforation Treatment Performed - Bullet Perforation
1981-01-23 Perforation Treatment Performed - Jet Perforation
1981-01-23 Perforation Treatment Performed - Selective Jet Perforations
1981-01-30 Well Began Production
1981-01-30 Well Fluid changed to Gas
1981-01-30 Well Mode changed to Flowing
1981-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-25 Well Fluid changed to Gas
1981-09-25 Well Mode changed to Flowing
2002-01-09 Well Log Performed
2002-01-11 Perforation Treatment Performed - Jet Perforation
2002-01-17 Perforation Treatment Performed - Fractured
2002-02-01 Well Fluid changed to Gas
2002-02-01 Well Mode changed to Flowing
2002-02-02 Well Fluid changed to Gas
2002-02-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-28 Bullet Perforation 703.00 703.40 20
1981-01-23 Selective Jet Perforations 426.50 429.50 0
1981-01-23 Perforation 421.50 423.50 2
1981-01-23 Selective Jet Perforations 420.00 421.00 0
1981-09-25 Packing Device Capped w/Cement 669.00 677.00 0
2002-01-11 Perforation 407.00 409.00 7
2002-01-17 Fracture 407.00 409.00 0
1979-12-28 Bullet Perforation 703.50 704.20 40
1979-12-28 Bullet Perforation 704.20 704.50 3
1979-12-28 Bullet Perforation 704.80 705.00 5
1981-01-23 Selective Jet Perforations 454.20 461.00 0
1981-01-23 Selective Jet Perforations 452.00 453.00 0
1981-01-23 Selective Jet Perforations 449.00 450.00 0
1981-01-23 Perforation 446.00 448.00 2
1981-01-23 Selective Jet Perforations 430.50 445.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3105 0.0 0.0 0.0
1982 3353 0.0 0.0 0.0
1983 7492 0.0 0.0 0.0
1984 7116 0.0 0.0 0.0
1985 8160 0.0 0.0 0.0
1986 5630 0.0 0.0 0.0
1987 7290 0.0 0.0 0.0
1988 8739 0.0 0.0 0.0
1989 8706 0.0 0.0 0.0
1990 8725 0.0 0.0 0.0
1991 8452 0.0 0.0 0.0
1992 8769 0.0 0.0 0.0
1993 8715 0.0 0.0 0.0
1994 8751 0.0 0.0 0.0
1995 8730 0.0 0.0 0.0
1996 8748 0.0 0.0 0.0
1997 8692 0.0 0.0 0.0
1998 8742 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8663 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8747 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8640 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References