X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144033011000

Well Details

Well ID: 0144033011000
Loading map...
Location: 00/11-30-014-03W4/0
Location Alias: 00/11-30-14-03 W4M
Location Alias 2: 00/11-30-014-03 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 03
Section: 30
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 11-30-14-3
Operator Name: Pine Cliff Energy Ltd.
License Number: 0052651
License Date: 1975-01-28
License Status: Issued
Spud Date: 1975-02-06
Final Drill Date: 1975-02-08
Well Total Depth: 523.30 m
Surface Hole Latitude: 50.203922
Surface Hole Longitude: -110.403969

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-01-28 Obtained License
1975-02-08 Finished Drilling
1975-02-08 Production Casing Operation Performed
1975-06-06 Perforation Treatment Performed - Selective Bullet Perforations
1975-08-30 Perforation Treatment Performed - Fractured
1975-10-02 Perforation Treatment Performed - Selective Bullet Perforations
1976-04-06 Perforation Treatment Performed - Fractured
1976-04-13 Well Mode changed to Drilled and Cased
1977-03-25 Well Began Production
1977-03-25 Well Fluid changed to Gas
1977-03-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-06-06 Selective Bullet Perforations 455.70 456.90 0
1975-06-06 Selective Bullet Perforations 469.70 473.70 0
1975-06-06 Selective Bullet Perforations 477.90 485.20 0
1975-06-06 Selective Bullet Perforations 489.80 489.80 0
1975-08-30 Fracture 455.70 489.80 0
1975-10-02 Selective Bullet Perforations 433.70 434.30 0
1975-10-02 Selective Bullet Perforations 434.90 435.60 0
1975-10-02 Selective Bullet Perforations 436.20 436.80 0
1976-04-06 Fracture 433.70 436.80 0
1975-06-06 Selective Bullet Perforations 457.50 458.10 0
1975-06-06 Selective Bullet Perforations 458.70 459.30 0
1975-06-06 Selective Bullet Perforations 462.40 463.00 0
1975-06-06 Selective Bullet Perforations 463.60 464.20 0
1975-06-06 Selective Bullet Perforations 464.80 465.40 0
1975-06-06 Selective Bullet Perforations 466.00 466.60 0
1975-06-06 Selective Bullet Perforations 467.30 467.90 0
1975-06-06 Selective Bullet Perforations 468.50 469.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 6289 0.0 0.0 0.0
1978 7185 0.0 0.0 0.0
1979 8729 0.0 0.0 0.0
1980 6962 0.0 0.0 0.0
1981 7937 0.0 0.0 0.0
1982 7763 0.0 0.0 0.0
1983 7403 0.0 0.0 0.0
1984 7181 0.0 0.0 0.0
1985 7168 0.0 0.0 0.0
1986 7408 0.0 0.0 0.0
1987 7228 0.0 0.0 0.0
1988 8245 0.0 0.0 0.0
1989 6677 0.0 0.0 0.0
1990 8478 0.0 0.0 0.0
1991 6920 0.0 0.0 0.0
1992 8495 0.0 0.0 0.0
1993 8713 0.0 0.0 0.0
1994 8755 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8766 0.0 0.0 0.0
1997 8704 0.0 0.0 0.0
1998 8720 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8111 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8771 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References