X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144032906020

Well Details

Well ID: 0144032906020
Loading map...
Location: 02/06-29-014-03W4/0
Location Alias: 02/06-29-14-03 W4M
Location Alias 2: 02/06-29-014-03 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 03
Section: 29
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 6-29-14-3
Operator Name: Pine Cliff Energy Ltd.
License Number: 0068915
License Date: 1978-03-21
License Status: Issued
Spud Date: 1978-06-25
Final Drill Date: 1978-06-29
Well Total Depth: 943.70 m
Surface Hole Latitude: 50.197920
Surface Hole Longitude: -110.380934

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-21 Obtained License
1978-06-29 Finished Drilling
1978-06-30 Drill Stem Test Performed
1978-07-02 Production Casing Operation Performed
1978-07-13 Perforation Treatment Performed - Bullet Perforation
1978-07-13 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-19 Perforation Treatment Performed - Selective Bullet Perforations
1978-10-31 Perforation Treatment Performed - Fractured
1978-11-20 Perforation Treatment Performed - Selective Bullet Perforations
1978-11-28 Perforation Treatment Performed - Fractured
1979-01-30 Well Mode changed to Drilled and Cased
1979-05-01 Well Began Production
1979-05-01 Well Fluid changed to Gas
1979-05-01 Well Mode changed to Flowing
1985-02-05 Well Fluid changed to Gas
1985-02-05 Well Mode changed to Suspended
1987-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-03-12 Plug Back Performed
1987-03-12 Well Fluid changed to Gas
1987-03-12 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-13 Selective Bullet Perforations 657.50 658.40 0
1978-07-13 Selective Bullet Perforations 679.00 680.00 0
1978-07-13 Selective Bullet Perforations 682.00 683.00 0
1978-07-13 Selective Bullet Perforations 684.00 686.00 0
1978-07-13 Selective Bullet Perforations 687.30 688.80 0
1978-07-13 Selective Bullet Perforations 691.00 692.30 0
1978-07-13 Selective Bullet Perforations 693.30 694.50 0
1978-07-13 Selective Bullet Perforations 696.00 697.00 0
1978-07-13 Selective Bullet Perforations 700.50 701.30 0
1978-07-13 Selective Bullet Perforations 702.00 702.50 0
1978-07-13 Selective Bullet Perforations 703.00 703.50 0
1978-07-13 Selective Bullet Perforations 660.10 663.30 0
1978-07-13 Selective Bullet Perforations 704.00 704.50 0
1978-07-13 Selective Bullet Perforations 705.00 708.30 0
1978-07-13 Bullet Perforation 708.60 712.30 3
1978-10-19 Selective Bullet Perforations 458.00 458.50 0
1978-10-19 Selective Bullet Perforations 459.00 460.00 0
1978-10-19 Selective Bullet Perforations 461.00 462.00 0
1978-10-19 Selective Bullet Perforations 462.50 463.00 0
1978-10-19 Selective Bullet Perforations 464.00 465.00 0
1978-10-19 Selective Bullet Perforations 466.00 466.50 0
1978-10-19 Selective Bullet Perforations 467.00 467.50 0
1978-07-13 Selective Bullet Perforations 664.30 665.80 0
1978-10-19 Selective Bullet Perforations 468.00 469.50 0
1978-10-19 Selective Bullet Perforations 470.50 472.50 0
1978-10-19 Selective Bullet Perforations 475.00 476.50 0
1978-10-19 Selective Bullet Perforations 478.50 481.00 0
1978-10-19 Selective Bullet Perforations 483.00 483.50 0
1978-10-31 Fracture 458.00 483.50 0
1978-11-20 Selective Bullet Perforations 435.50 436.00 0
1978-11-20 Selective Bullet Perforations 436.50 437.00 0
1978-11-20 Selective Bullet Perforations 437.50 438.00 0
1978-11-20 Selective Bullet Perforations 438.50 439.00 0
1978-07-13 Selective Bullet Perforations 666.50 667.00 0
1978-11-20 Selective Bullet Perforations 439.50 440.50 0
1978-11-20 Selective Bullet Perforations 441.50 442.50 0
1978-11-20 Selective Bullet Perforations 443.50 444.50 0
1978-11-20 Selective Bullet Perforations 446.50 448.30 0
1978-11-20 Selective Bullet Perforations 451.00 454.00 0
1978-11-28 Fracture 435.50 454.00 0
1987-03-12 Packing Device Capped w/Cement 630.00 638.00 0
1978-07-13 Selective Bullet Perforations 668.70 670.00 0
1978-07-13 Selective Bullet Perforations 672.00 673.00 0
1978-07-13 Selective Bullet Perforations 673.40 674.00 0
1978-07-13 Selective Bullet Perforations 675.50 676.60 0
1978-07-13 Selective Bullet Perforations 677.00 678.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 5222 0.0 0.0 0.0
1980 5020 0.0 0.0 0.0
1981 7572 0.0 0.0 0.0
1982 8023 0.0 0.0 0.0
1983 7412 0.0 0.0 0.0
1984 7333 0.0 0.0 0.0
1985 713 0.0 0.0 0.0

For data sources see[5]

References