X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144032416000

Well Details

Well ID: 0144032416000
Loading map...
Location: 00/16-24-014-03W4/0
Location Alias: 00/16-24-14-03 W4M
Location Alias 2: 00/16-24-014-03 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 03
Section: 24
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 16-24-14-3
Operator Name: Canlin Energy Corporation
License Number: 0054017
License Date: 1975-06-24
License Status: Issued
Spud Date: 1975-06-28
Final Drill Date: 1975-07-01
Well Total Depth: 597.70 m
Surface Hole Latitude: 50.192890
Surface Hole Longitude: -110.278579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-24 Obtained License
1975-07-01 Finished Drilling
1975-07-01 Well Mode changed to Drilled and Cased
1975-07-02 Production Casing Operation Performed
1975-10-10 Perforation Treatment Performed - Selective Bullet Perforations
1975-10-22 Perforation Treatment Performed - Fractured
1975-11-08 Well Began Production
1975-11-08 Well Fluid changed to Gas
1975-11-08 Well Mode changed to Flowing
1976-03-31 Perforation Treatment Performed - Fractured
1998-11-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-10 Selective Bullet Perforations 346.30 349.30 0
1975-10-10 Selective Bullet Perforations 413.90 416.70 0
1975-10-10 Selective Bullet Perforations 420.30 421.80 0
1975-10-10 Selective Bullet Perforations 423.70 426.10 0
1975-10-10 Selective Bullet Perforations 430.10 473.70 0
1975-10-10 Selective Bullet Perforations 474.90 476.40 0
1975-10-10 Selective Bullet Perforations 478.20 480.40 0
1975-10-10 Selective Bullet Perforations 481.90 485.20 0
1975-10-10 Selective Bullet Perforations 487.10 488.90 0
1975-10-10 Selective Bullet Perforations 494.70 497.10 0
1975-10-10 Selective Bullet Perforations 499.60 503.20 0
1975-10-10 Selective Bullet Perforations 352.30 355.10 0
1975-10-10 Selective Bullet Perforations 505.40 510.50 0
1975-10-10 Selective Bullet Perforations 512.70 514.20 0
1975-10-10 Selective Bullet Perforations 521.80 525.80 0
1975-10-10 Selective Bullet Perforations 527.90 541.90 0
1975-10-10 Selective Bullet Perforations 543.80 547.40 0
1975-10-10 Selective Bullet Perforations 548.60 553.80 0
1975-10-10 Selective Bullet Perforations 555.00 560.20 0
1975-10-10 Selective Bullet Perforations 570.30 571.50 0
1975-10-10 Selective Bullet Perforations 575.20 578.80 0
1975-10-10 Selective Bullet Perforations 580.60 594.70 0
1975-10-10 Selective Bullet Perforations 357.20 360.90 0
1975-10-10 Selective Bullet Perforations 595.30 595.30 0
1975-10-22 Fracture 346.30 595.30 0
1976-03-31 Fracture 473.70 595.30 0
1975-10-10 Selective Bullet Perforations 363.30 365.50 0
1975-10-10 Selective Bullet Perforations 367.00 369.70 0
1975-10-10 Selective Bullet Perforations 371.90 375.80 0
1975-10-10 Selective Bullet Perforations 380.40 383.40 0
1975-10-10 Selective Bullet Perforations 403.60 406.30 0
1975-10-10 Selective Bullet Perforations 408.40 410.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 744 0.0 0.0 0.0
1976 8504 0.0 0.0 0.0
1977 5801 0.0 0.0 0.0
1978 7980 0.0 0.0 0.0
1979 6596 0.0 0.0 0.0
1980 8383 0.0 0.0 0.0
1981 8373 0.0 0.0 0.0
1982 8643 0.0 0.0 0.0
1983 7932 0.0 0.0 0.0
1984 8658 0.0 0.0 0.0
1985 6148 0.0 0.0 0.0
1986 7436 0.0 0.0 0.0
1987 8394 0.0 0.0 0.0
1988 8215 0.0 0.0 0.0
1989 8360 0.0 0.0 0.0
1990 8338 0.0 0.0 0.0
1991 8320 0.0 0.0 0.0
1992 6557 0.0 0.0 0.0
1993 8367 0.0 0.0 0.0
1994 2159 0.0 0.0 0.0

For data sources see[5]

References