X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144022606022

Well Details

Well ID: 0144022606022
Loading map...
Location: 02/06-26-014-02W4/2
Location Alias: 02/06-26-14-02 W4M
Location Alias 2: 02/06-26-014-02 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 02
Section: 26
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 6-26-14-2
Operator Name: Pine Cliff Energy Ltd.
License Number: 0096420
License Date: 1982-06-23
License Status: Issued
Spud Date: 1982-09-11
Final Drill Date: 1982-09-14
Well Total Depth: 560.00 m
Surface Hole Latitude: 50.198895
Surface Hole Longitude: -110.178329

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-23 Obtained License
1982-09-14 Finished Drilling
1982-09-14 Well Mode changed to Drilled and Cased
1982-09-15 Drill Stem Test Performed
1982-09-16 Drill Stem Test Performed
1982-09-16 Production Casing Operation Performed
1982-11-02 Perforation Treatment Performed - Jet Perforation
1982-11-05 Perforation Treatment Performed - Fractured
1982-12-05 Perforation Treatment Performed - Jet Perforation
1982-12-06 Well Began Production
1982-12-06 Well Fluid changed to Gas
1982-12-06 Well Mode changed to Flowing
1982-12-07 Perforation Treatment Performed - Fractured
1987-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-08-22 Plug Back Performed
1987-08-22 Well Fluid changed to Gas
1987-08-22 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-02 Perforation 525.00 529.50 7
1982-11-05 Fracture 525.00 529.50 0
1982-12-05 Perforation 511.50 516.70 7
1982-12-07 Fracture 511.50 516.70 0
1987-08-22 Packing Device Capped w/Cement 517.00 518.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 379 0.0 0.0 0.0
1983 1134 0.0 0.0 0.0
1984 7065 0.0 0.0 0.0
1985 8340 0.0 0.0 0.0
1986 8753 0.0 0.0 0.0
1987 8740 0.0 0.0 0.0
1988 8755 0.0 0.0 0.0
1989 8666 0.0 0.0 0.0
1990 8754 0.0 0.0 0.0
1991 8020 0.0 0.0 0.0
1992 8717 0.0 0.0 0.0
1993 8729 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8675 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References