If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0144013010002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.20113,"lon":-110.129405,"icon":""}]} |
| Location: 00/10-30-014-01W4/2 | |
| Location Alias: 00/10-30-14-01 W4M | |
| Location Alias 2: 00/10-30-014-01 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 014 | |
| Meridian: 4 | |
| Range: 01 | |
| Section: 30 | |
| County/Municipality: Cypress County | |
| Well Name: PINE CLIFF MEDHAT 10-30-14-1 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0063838 | |
| License Date: 1977-05-16 | |
| License Status: Issued | |
| Spud Date: 1977-06-06 | |
| Final Drill Date: 1977-06-08 | |
| Well Total Depth: 851.60 m | |
| Surface Hole Latitude: 50.201130 | |
| Surface Hole Longitude: -110.129405 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-05-16 | Obtained License |
| 1977-06-08 | Finished Drilling |
| 1977-06-08 | Well Mode changed to Drilled and Cased |
| 1977-06-10 | Production Casing Operation Performed |
| 1977-06-12 | Perforation Treatment Performed - Selective Jet Perforations |
| 1977-06-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1977-06-18 | Perforation Treatment Performed - Jet Perforation |
| 1977-06-18 | Perforation Treatment Performed - Selective Jet Perforations |
| 1977-06-19 | Perforation Treatment Performed - Fractured |
| 1977-06-28 | Perforation Treatment Performed - Fractured |
| 1977-06-28 | Perforation Treatment Performed - Selective Jet Perforations |
| 1977-08-18 | Well Began Production |
| 1977-08-18 | Well Fluid changed to Gas |
| 1977-08-18 | Well Mode changed to Flowing |
| 1998-10-19 | Well Log Performed |
| 1998-10-20 | Perforation Treatment Performed - Jet Perforation |
| 1998-10-26 | Perforation Treatment Performed - Fractured |
| 1998-10-30 | Well Structure changed to Commingled |
| 2007-05-07 | Perforation Treatment Performed - Jet Perforation |
| 2007-05-10 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1977-06-12 | Selective Jet Perforations | 812.30 | 812.30 | 7 |
| 1977-06-28 | Selective Jet Perforations | 476.40 | 476.70 | 0 |
| 1977-06-28 | Selective Jet Perforations | 477.30 | 477.90 | 0 |
| 1977-06-28 | Selective Jet Perforations | 478.50 | 479.10 | 0 |
| 1977-06-28 | Selective Jet Perforations | 479.80 | 480.40 | 0 |
| 1977-06-28 | Selective Jet Perforations | 481.00 | 481.00 | 0 |
| 1977-06-28 | Fracture | 446.80 | 481.00 | 0 |
| 1998-10-20 | Perforation | 531.70 | 535.80 | 13 |
| 1998-10-26 | Fracture | 531.70 | 535.80 | 0 |
| 2007-05-07 | Perforation | 401.00 | 403.00 | 13 |
| 2007-05-07 | Perforation | 412.00 | 414.00 | 13 |
| 1977-06-12 | Selective Jet Perforations | 813.50 | 813.50 | 7 |
| 2007-05-07 | Perforation | 422.00 | 424.00 | 13 |
| 2007-05-07 | Perforation | 433.00 | 435.00 | 13 |
| 2007-05-10 | Fracture | 401.00 | 403.00 | 0 |
| 2007-05-10 | Fracture | 412.00 | 414.00 | 0 |
| 2007-05-10 | Fracture | 422.00 | 424.00 | 0 |
| 2007-05-10 | Fracture | 433.00 | 435.00 | 0 |
| 1977-06-18 | Packing Device Capped w/Cement | 784.90 | 792.50 | 0 |
| 1977-06-18 | Selective Jet Perforations | 714.10 | 714.10 | 7 |
| 1977-06-18 | Perforation | 716.00 | 717.80 | 7 |
| 1977-06-19 | Fracture | 714.10 | 717.80 | 0 |
| 1977-06-28 | Selective Jet Perforations | 446.80 | 447.80 | 0 |
| 1977-06-28 | Selective Jet Perforations | 448.40 | 474.90 | 0 |
| 1977-06-28 | Selective Jet Perforations | 475.50 | 476.10 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1977 | 3240 | 0.0 | 0.0 | 0.0 |
| 1978 | 7847 | 0.0 | 0.0 | 0.0 |
| 1979 | 7671 | 0.0 | 0.0 | 0.0 |
| 1980 | 7856 | 0.0 | 0.0 | 0.0 |
| 1981 | 5773 | 0.0 | 0.0 | 0.0 |
| 1982 | 5205 | 0.0 | 0.0 | 0.0 |
| 1983 | 4672 | 0.0 | 0.0 | 0.0 |
| 1984 | 5187 | 0.0 | 0.0 | 0.0 |
| 1985 | 6973 | 0.0 | 0.0 | 0.0 |
| 1986 | 6049 | 0.0 | 0.0 | 0.0 |
| 1987 | 6958 | 0.0 | 0.0 | 0.0 |
| 1988 | 8371 | 0.0 | 0.0 | 0.0 |
| 1989 | 8608 | 0.0 | 0.0 | 0.0 |
| 1990 | 8423 | 0.0 | 0.0 | 0.0 |
| 1991 | 8400 | 0.0 | 0.0 | 0.0 |
| 1992 | 8741 | 0.0 | 0.0 | 0.0 |
| 1993 | 8015 | 0.0 | 0.0 | 0.0 |
| 1994 | 744 | 0.0 | 0.0 | 0.0 |
| 1996 | 720 | 0.0 | 0.0 | 0.0 |
| 1997 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]