If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144011207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.157631,"lon":-110.005539,"icon":""}]} |
Location: 00/07-12-014-01W4/0 | |
Location Alias: 00/07-12-14-01 W4M | |
Location Alias 2: 00/07-12-014-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 01 | |
Section: 12 | |
County/Municipality: Cypress County | |
Well Name: PINE CLIFF MEDHAT 7-12-14-1 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0416032 | |
License Date: 2009-12-22 | |
License Status: Issued | |
Spud Date: 2010-01-03 | |
Final Drill Date: 2010-01-06 | |
Well Total Depth: 984.00 m | |
Surface Hole Latitude: 50.157631 | |
Surface Hole Longitude: -110.005539 |
Date | Event |
---|---|
2009-12-22 | Obtained License |
2010-01-03 | Direction Drilling Operation Performed - Deviate |
2010-01-03 | Surface Casing Operation Performed |
2010-01-06 | Finished Drilling |
2010-01-06 | Well Mode changed to Drilled and Cased |
2010-01-07 | Production Casing Operation Performed |
2010-01-07 | Rig Released |
2010-02-04 | Well Log Performed |
2010-02-22 | Well Log Performed |
2010-08-24 | Perforation Treatment Performed - Jet Perforation |
2010-09-09 | Perforation Treatment Performed - Fractured |
2010-09-10 | Perforation Treatment Performed - Fractured |
2010-09-17 | Well Began Production |
2010-09-17 | Well Fluid changed to Gas |
2010-09-17 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-01-03 | 5.60 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-24 | Perforation | 539.00 | 542.00 | 7 |
2010-08-24 | Perforation | 841.50 | 844.50 | 7 |
2010-09-09 | Fracture | 841.50 | 844.50 | 0 |
2010-09-10 | Fracture | 810.00 | 813.00 | 0 |
2010-09-10 | Fracture | 773.00 | 776.00 | 0 |
2010-09-10 | Fracture | 732.00 | 735.00 | 0 |
2010-09-10 | Fracture | 672.50 | 675.50 | 0 |
2010-09-10 | Fracture | 650.00 | 653.00 | 0 |
2010-09-10 | Fracture | 604.00 | 607.00 | 0 |
2010-09-10 | Fracture | 582.00 | 585.00 | 0 |
2010-09-10 | Fracture | 568.00 | 571.00 | 0 |
2010-08-24 | Perforation | 568.00 | 571.00 | 7 |
2010-09-10 | Fracture | 539.00 | 542.00 | 0 |
2010-08-24 | Perforation | 582.00 | 585.00 | 7 |
2010-08-24 | Perforation | 604.00 | 607.00 | 7 |
2010-08-24 | Perforation | 650.00 | 653.00 | 7 |
2010-08-24 | Perforation | 672.50 | 675.50 | 7 |
2010-08-24 | Perforation | 732.00 | 735.00 | 7 |
2010-08-24 | Perforation | 773.00 | 776.00 | 7 |
2010-08-24 | Perforation | 810.00 | 813.00 | 7 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2538 | 0.0 | 0.0 | 0.0 |
2011 | 7608 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8663 | 0.0 | 0.0 | 0.0 |
2015 | 8639 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8509 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]