X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144010916002

Well Details

Well ID: 0144010916002
Loading map...
Location: 00/16-09-014-01W4/2
Location Alias: 00/16-09-14-01 W4M
Location Alias 2: 00/16-09-014-01 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 01
Section: 09
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 16-9-14-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0049758
License Date: 1974-05-14
License Status: Suspension
Spud Date: 1974-08-01
Final Drill Date: 1974-08-03
Well Total Depth: 405.70 m
Surface Hole Latitude: 50.161921
Surface Hole Longitude: -110.076613

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-05-14 Obtained License
1974-08-03 Drill Stem Test Performed
1974-08-03 Finished Drilling
1974-08-03 Well Log Performed
1974-08-03 Well Mode changed to Drilled and Cased
1974-08-04 Production Casing Operation Performed
1974-08-26 Perforation Treatment Performed - Selective Jet Perforations
1974-08-27 Perforation Treatment Performed - Fractured
1976-11-06 Well Log Performed
1976-11-18 Perforation Treatment Performed - Selective Jet Perforations
2001-05-05 Well Log Performed
2001-06-08 Perforation Treatment Performed - Jet Perforation
2001-06-09 Well Began Production
2001-06-09 Well Fluid changed to Gas
2001-06-09 Well Mode changed to Flowing
2012-06-01 Well Fluid changed to Gas
2012-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-08-26 Selective Jet Perforations 347.50 348.40 0
1976-11-18 Selective Jet Perforations 375.80 376.10 0
1976-11-18 Selective Jet Perforations 378.00 378.30 0
1976-11-18 Selective Jet Perforations 378.60 378.90 0
1976-11-18 Selective Jet Perforations 379.20 379.20 0
2001-06-08 Perforation 140.50 141.50 7
1974-08-26 Selective Jet Perforations 349.00 374.90 0
1974-08-26 Selective Jet Perforations 375.50 376.10 0
1974-08-26 Selective Jet Perforations 378.00 378.60 0
1974-08-26 Selective Jet Perforations 379.20 380.40 0
1974-08-26 Selective Jet Perforations 381.30 381.30 0
1974-08-27 Fracture 347.50 380.40 0
1976-11-18 Selective Jet Perforations 374.60 374.90 0
1976-11-18 Selective Jet Perforations 375.20 375.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5136 0.0 0.0 0.0
2002 5831 0.0 0.0 0.0
2003 3671 0.0 0.0 0.0
2004 6599 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 7559 0.0 0.0 0.0
2007 6552 0.0 0.0 0.0
2008 8567 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 2136 0.0 0.0 0.0

For data sources see[5]

References