X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144010607000

Well Details

Well ID: 0144010607000
Loading map...
Location: 00/07-06-014-01W4/0
Location Alias: 00/07-06-14-01 W4M
Location Alias 2: 00/07-06-014-01 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 01
Section: 06
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 7-6-14-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0054462
License Date: 1975-07-31
License Status: Suspension
Spud Date: 1975-08-23
Final Drill Date: 1975-08-23
Well Total Depth: 426.70 m
Surface Hole Latitude: 50.140452
Surface Hole Longitude: -110.124371

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-07-31 Obtained License
1975-08-23 Finished Drilling
1975-08-23 Well Log Performed
1975-08-23 Well Mode changed to Drilled and Cased
1975-08-24 Production Casing Operation Performed
1975-09-27 Perforation Treatment Performed - Selective Jet Perforations
1975-09-29 Perforation Treatment Performed - Fractured
1975-10-06 Well Began Production
1975-10-06 Well Fluid changed to Gas
1975-10-06 Well Mode changed to Flowing
2006-07-16 Perforation Treatment Performed - Jet Perforation
2006-07-24 Perforation Treatment Performed - Fractured
2014-09-01 Well Fluid changed to Gas
2014-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-27 Selective Jet Perforations 342.90 353.60 0
2006-07-16 Perforation 319.00 321.00 13
2006-07-16 Perforation 334.00 336.00 13
2006-07-16 Perforation 366.00 368.00 13
2006-07-16 Perforation 373.00 375.00 13
2006-07-16 Perforation 396.00 398.00 13
2006-07-24 Fracture 308.00 310.00 0
2006-07-24 Fracture 319.00 321.00 0
2006-07-24 Fracture 334.00 336.00 0
2006-07-24 Fracture 366.00 368.00 0
2006-07-24 Fracture 373.00 375.00 0
1975-09-27 Selective Jet Perforations 353.90 354.20 0
2006-07-24 Fracture 396.00 398.00 0
1975-09-27 Selective Jet Perforations 355.10 355.40 0
1975-09-27 Selective Jet Perforations 381.60 382.20 0
1975-09-27 Selective Jet Perforations 382.50 382.80 0
1975-09-27 Selective Jet Perforations 384.00 385.90 0
1975-09-27 Selective Jet Perforations 386.20 386.20 0
1975-09-29 Fracture 342.90 386.20 0
2006-07-16 Perforation 308.00 310.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 2046 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8303 0.0 0.0 0.0
1978 7847 0.0 0.0 0.0
1979 7671 0.0 0.0 0.0
1980 7856 0.0 0.0 0.0
1981 6362 0.0 0.0 0.0
1982 5205 0.0 0.0 0.0
1983 6850 0.0 0.0 0.0
1984 4112 0.0 0.0 0.0
1985 6973 0.0 0.0 0.0
1986 7152 0.0 0.0 0.0
1987 7098 0.0 0.0 0.0
1988 8131 0.0 0.0 0.0
1989 8634 0.0 0.0 0.0
1990 8159 0.0 0.0 0.0
1991 7289 0.0 0.0 0.0
1992 6126 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8735 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8753 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 5039 0.0 0.0 0.0

For data sources see[5]

References