X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144010110000

Well Details

Well ID: 0144010110000
Loading map...
Location: 00/10-01-014-01W4/0
Location Alias: 00/10-01-14-01 W4M
Location Alias 2: 00/10-01-014-01 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 01
Section: 01
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 10-1-14-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0049677
License Date: 1974-05-07
License Status: Abandoned
Spud Date: 1974-09-16
Final Drill Date: 1974-09-18
Well Total Depth: 416.10 m
Surface Hole Latitude: 50.146095
Surface Hole Longitude: -110.012760

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-05-07 Obtained License
1974-09-18 Finished Drilling
1974-09-18 Well Log Performed
1974-09-18 Well Mode changed to Drilled and Cased
1974-09-19 Production Casing Operation Performed
1974-10-09 Perforation Treatment Performed - Selective Jet Perforations
1974-10-12 Perforation Treatment Performed - Fractured
1975-01-31 Well Began Production
1975-01-31 Well Fluid changed to Gas
1975-01-31 Well Mode changed to Flowing
2000-07-08 Well Log Performed
2001-06-10 Well Abandoned
2001-06-10 Well Fluid changed to Gas
2001-06-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-10-09 Selective Jet Perforations 352.00 352.70 0
1974-10-09 Selective Jet Perforations 386.80 386.80 0
1974-10-12 Fracture 352.00 386.80 0
1974-10-09 Selective Jet Perforations 353.30 354.20 0
1974-10-09 Selective Jet Perforations 371.60 372.20 0
1974-10-09 Selective Jet Perforations 378.30 378.90 0
1974-10-09 Selective Jet Perforations 379.50 380.10 0
1974-10-09 Selective Jet Perforations 381.00 381.60 0
1974-10-09 Selective Jet Perforations 382.20 382.80 0
1974-10-09 Selective Jet Perforations 383.40 384.70 0
1974-10-09 Selective Jet Perforations 385.60 386.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 7894 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 8303 0.0 0.0 0.0
1978 7847 0.0 0.0 0.0
1979 7671 0.0 0.0 0.0
1980 7856 0.0 0.0 0.0
1981 6362 0.0 0.0 0.0
1982 5205 0.0 0.0 0.0
1983 8353 0.0 0.0 0.0
1984 1630 0.0 0.0 0.0
1985 3957 0.0 0.0 0.0
1986 5556 0.0 0.0 0.0
1987 5394 0.0 0.0 0.0
1988 8219 0.0 0.0 0.0
1989 8058 0.0 0.0 0.0
1990 5131 0.0 0.0 0.0
1991 7943 0.0 0.0 0.0
1992 8741 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 8749 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 5855 0.0 0.0 0.0

For data sources see[5]

References