If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134263210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.130211,"lon":-113.51291,"icon":""}]} |
Location: 00/10-32-013-26W4/0 | |
Location Alias: 00/10-32-13-26 W4M | |
Location Alias 2: 00/10-32-013-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 26 | |
Section: 32 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: MOBIL CLARESHOLM 10-32-13-26 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0214878 | |
License Date: 1998-05-01 | |
License Status: RecCertified | |
Spud Date: 1998-05-14 | |
Final Drill Date: 1998-05-21 | |
Well Total Depth: 1834.00 m | |
Surface Hole Latitude: 50.130211 | |
Surface Hole Longitude: -113.512910 |
Date | Event |
---|---|
1998-05-01 | Obtained License |
1998-05-14 | Well Log Performed |
1998-05-16 | Surface Casing Operation Performed |
1998-05-21 | Finished Drilling |
1998-05-21 | Well Log Performed |
1998-05-22 | Production Casing Operation Performed |
1998-05-22 | Rig Released |
1998-05-22 | Well Mode changed to Drilled and Cased |
1998-06-05 | Perforation Treatment Performed - Jet Perforation |
1998-06-05 | Well Log Performed |
1998-06-07 | Perforation Treatment Performed - Fractured |
2000-11-06 | Well Began Production |
2000-11-06 | Well Fluid changed to Gas |
2000-11-06 | Well Mode changed to Flowing |
2008-09-01 | Well Fluid changed to Gas |
2008-09-01 | Well Mode changed to Suspended |
2010-06-18 | Well Log Performed |
2010-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-19 | Perforation Treatment Performed - Jet Perforation |
2010-06-19 | Plug Back Performed |
2010-06-19 | Well Fluid changed to Gas |
2010-06-19 | Well Log Performed |
2010-06-19 | Well Mode changed to Abandoned Zone |
2010-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-21 | Perforation Treatment Performed - Jet Perforation |
2010-06-21 | Well Log Performed |
2010-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-22 | Perforation Treatment Performed - Jet Perforation |
2010-06-22 | Well Log Performed |
2010-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-23 | Perforation Treatment Performed - Jet Perforation |
2010-06-23 | Well Log Performed |
2010-06-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-25 | Perforation Treatment Performed - Jet Perforation |
2010-06-25 | Well Log Performed |
2012-10-20 | Well Abandoned |
2012-10-20 | Well Fluid changed to Gas |
2012-10-20 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-06-05 | Perforation | 1737.00 | 1739.00 | 18 |
2010-06-23 | Perforation | 635.00 | 636.00 | 17 |
2010-06-24 | Packing Device Capped w/Cement | 620.70 | 630.10 | 0 |
2010-06-25 | Perforation | 471.00 | 472.00 | 17 |
2010-06-25 | Packing Device Capped w/Cement | 455.10 | 465.50 | 0 |
1998-06-07 | Fracture | 1737.00 | 1739.00 | 0 |
2010-06-19 | Packing Device Capped w/Cement | 1717.00 | 1725.00 | 0 |
2010-06-19 | Perforation | 1331.00 | 1332.00 | 17 |
2010-06-20 | Packing Device Capped w/Cement | 1310.00 | 1318.10 | 0 |
2010-06-21 | Perforation | 1175.00 | 1176.00 | 17 |
2010-06-22 | Packing Device Capped w/Cement | 1162.00 | 1172.00 | 0 |
2010-06-22 | Perforation | 817.50 | 818.50 | 17 |
2010-06-23 | Packing Device Capped w/Cement | 802.00 | 812.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1340 | 0.0 | 0.0 | 0.0 |
2001 | 8759 | 0.0 | 0.0 | 0.0 |
2002 | 6523 | 0.0 | 0.0 | 0.0 |
2003 | 5599 | 0.0 | 0.0 | 0.0 |
2004 | 3130 | 0.0 | 0.0 | 0.0 |
2005 | 2185 | 0.0 | 0.0 | 0.0 |
2006 | 3094 | 0.0 | 0.0 | 0.0 |
2007 | 4550 | 0.0 | 0.0 | 0.0 |
For data sources see[5]