X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134263204000

Well Details

Well ID: 0134263204000
Loading map...
Location: 00/04-32-013-26W4/0
Location Alias: 00/04-32-13-26 W4M
Location Alias 2: 00/04-32-013-26 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 26
Section: 32
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CNRL CLARES 4-32-13-26
Operator Name: Canadian Natural Resources Limited
License Number: 0085848
License Date: 1980-09-24
License Status: Issued
Spud Date: 1980-10-03
Final Drill Date: 1980-11-04
Well Total Depth: 2178.00 m
Surface Hole Latitude: 50.124352
Surface Hole Longitude: -113.525010

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-24 Obtained License
1980-10-31 Drill Stem Test Performed
1980-11-02 Drill Stem Test Performed
1980-11-04 Finished Drilling
1980-11-04 Well Log Performed
1980-11-07 Drill Stem Test Performed
1980-11-08 Production Casing Operation Performed
1980-12-15 Perforation Treatment Performed - Jet Perforation
1980-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-09 Perforation Treatment Performed - Jet Perforation
1981-01-15 Perforation Treatment Performed - Fractured
1981-01-22 Well Mode changed to Drilled and Cased
1983-03-16 Well Began Production
1983-03-16 Well Fluid changed to Gas
1983-03-16 Well Mode changed to Flowing
2001-06-20 Well Fluid changed to Gas
2001-06-20 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-15 Perforation 2046.50 2050.30 13
1980-12-17 Acid Treatment 2046.50 2050.30 0
1981-01-08 Packing Device Capped w/Cement 2045.50 2045.50 0
1981-01-09 Perforation 2030.80 2033.40 13
1981-01-15 Fracture 2030.80 2033.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4605 0.0 0.0 0.0
1984 7149 0.0 0.0 0.0
1985 1846 0.0 0.0 0.0
1986 2845 0.0 0.0 0.0
1987 3857 0.0 0.0 0.0
1988 6385 0.0 0.0 0.0
1989 8691 0.0 0.0 0.0
1990 8458 0.0 0.0 0.0
1991 5423 0.0 0.0 0.0
1992 8694 0.0 0.0 0.0
1993 8601 0.0 0.0 0.0
1994 8654 0.0 0.0 0.0
1995 6702 0.0 0.0 0.0
1996 8462 0.0 0.0 0.0
1997 8355 0.0 0.0 0.0
1998 8609 0.0 0.0 0.0
1999 8158 0.0 0.0 0.0
2000 8623 0.0 0.0 0.0
2001 8385 0.0 0.0 0.0
2002 8058 0.0 0.0 0.0
2003 8711 0.0 0.0 0.0
2004 8094 0.0 0.0 0.0
2005 8518 0.0 0.0 0.0
2006 8652 0.0 0.0 0.0
2007 8140 0.0 0.0 0.0
2008 8308 0.0 0.0 0.0
2009 8147 0.0 0.0 0.0
2010 8720 0.0 0.0 0.0
2011 7073 0.0 0.0 0.0
2012 8495 0.0 0.0 0.0
2013 8587 0.0 0.0 0.0
2014 8596 0.0 0.0 0.0
2015 8567 0.0 0.0 0.0
2016 8575 0.0 0.0 0.0
2017 8447 0.0 0.0 0.0
2018 8591 0.0 0.0 0.0
2019 8568 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References