If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134261203030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.066033,"lon":-113.427221,"icon":""}]} |
Location: 03/03-12-013-26W4/0 | |
Location Alias: 03/03-12-13-26 W4M | |
Location Alias 2: 03/03-12-013-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 26 | |
Section: 12 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: CNRL CLARES 3-12-13-26 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0084912 | |
License Date: 1980-08-13 | |
License Status: RecCertified | |
Spud Date: 1980-10-25 | |
Final Drill Date: 1980-11-20 | |
Well Total Depth: 2090.00 m | |
Surface Hole Latitude: 50.066033 | |
Surface Hole Longitude: -113.427221 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-13 | Obtained License |
1980-10-27 | Lost Circulation Occurred |
1980-11-11 | Drill Stem Test Performed |
1980-11-16 | Drill Stem Test Performed |
1980-11-17 | Drill Stem Test Performed |
1980-11-20 | Finished Drilling |
1980-11-20 | Well Log Performed |
1980-11-22 | Production Casing Operation Performed |
1981-04-01 | Well Mode changed to Drilled and Cased |
1993-10-17 | Well Log Performed |
1993-10-18 | Perforation Treatment Performed - Jet Perforation |
1993-10-18 | Well Mode changed to Drilled and Cased |
1999-06-09 | Well Began Production |
1999-06-09 | Well Fluid changed to Gas |
1999-06-09 | Well Mode changed to Flowing |
2005-12-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-12-13 | Plug Back Performed |
2005-12-13 | Well Fluid changed to Gas |
2005-12-13 | Well Mode changed to Abandoned Zone |
2005-12-16 | Perforation Treatment Performed - Jet Perforation |
2005-12-17 | Perforation Treatment Performed - Cement Plug |
2005-12-17 | Perforation Treatment Performed - Remedial Casing |
2005-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-12-18 | Perforation Treatment Performed - Jet Perforation |
2005-12-20 | Perforation Treatment Performed - Remedial Casing |
2005-12-21 | Perforation Treatment Performed - Jet Perforation |
2005-12-21 | Well Log Performed |
2006-01-04 | Perforation Treatment Performed - Remedial Casing |
2006-01-05 | Perforation Treatment Performed - Jet Perforation |
2006-01-05 | Well Log Performed |
2006-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-01-06 | Perforation Treatment Performed - Remedial Casing |
2006-01-09 | Well Abandoned |
2006-01-09 | Well Fluid changed to Gas |
2006-01-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-10-18 | Perforation | 1974.00 | 1975.50 | 13 |
2005-12-21 | Perforation | 605.00 | 606.00 | 13 |
2005-12-21 | Perforation | 560.00 | 561.00 | 13 |
2006-01-04 | Remedial Casing Cementing | 560.00 | 606.00 | 0 |
2006-01-05 | Perforation | 234.00 | 235.00 | 13 |
2006-01-06 | Remedial Casing Cementing | 234.00 | 235.00 | 0 |
2006-01-06 | Packing Device Capped w/Cement | 211.00 | 229.70 | 0 |
2005-12-13 | Packing Device Capped w/Cement | 1956.80 | 1965.00 | 0 |
2005-12-16 | Perforation | 1140.00 | 1141.00 | 13 |
2005-12-17 | Remedial Casing Cementing | 1140.00 | 1141.00 | 0 |
2005-12-17 | Cement Plug | 1124.00 | 1134.00 | 0 |
2005-12-18 | Perforation | 1075.00 | 1076.00 | 13 |
2005-12-18 | Packing Device Capped w/Cement | 1062.00 | 1070.00 | 0 |
2005-12-18 | Perforation | 740.00 | 741.00 | 13 |
2005-12-20 | Remedial Casing Cementing | 740.00 | 741.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 4938 | 0.0 | 0.0 | 0.0 |
2000 | 5473 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-10-27 | Lost Circulation | 185.00 | 185.00 |
For data sources see[6]