X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134253606003

Well Details

Well ID: 0134253606003
Loading map...
Location: 00/06-36-013-25W4/3
Location Alias: 00/06-36-13-25 W4M
Location Alias 2: 00/06-36-013-25 W4/03
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 25
Section: 36
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: PIONEER CANADA ETAL CARM 6-36-13-25
Operator Name: TAQA North Ltd.
License Number: 0081100
License Date: 1980-02-14
License Status: Re-Entered
Spud Date: 1980-02-20
Final Drill Date: 1980-03-24
Well Total Depth: 2222.30 m
Surface Hole Latitude: 50.125283
Surface Hole Longitude: -113.292052

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-14 Obtained License
1980-03-08 Well Log Performed
1980-03-09 Drill Stem Test Performed
1980-03-11 Drill Stem Test Performed
1980-03-19 Water Flow Occurred
1980-03-20 Drill Stem Test Performed
1980-03-24 Finished Drilling
1980-03-24 Well Log Performed
1980-03-24 Well Mode changed to Drilled and Cased
1980-03-26 Production Casing Operation Performed
1980-04-07 Perforation Treatment Performed - Open-Hole Completion
1980-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-27 Perforation Treatment Performed - Jet Perforation
1980-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-08 Perforation Treatment Performed - Jet Perforation
1982-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-11 Well Began Production
1982-05-11 Well Fluid changed to Crude Oil
1982-05-11 Well Mode changed to Pumping
1982-10-07 Perforation Treatment Performed - Fractured
1983-01-12 Perforation Treatment Performed - Fractured
1993-12-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-12-24 Plug Back Performed
1993-12-24 Well Abandoned
1993-12-24 Well Fluid changed to Crude Oil
1993-12-24 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-07 Open Hole/Barefoot Completion 2208.10 2222.30 0
1980-10-01 Acid Treatment 2164.00 2169.00 0
1980-10-02 Acid Treatment 2150.00 2160.00 0
1980-10-03 Acid Treatment 2111.00 2113.00 0
1982-05-07 Packing Device Capped w/Cement 2023.00 2031.00 0
1982-05-08 Perforation 1779.50 1782.50 13
1982-05-09 Acid Treatment 1779.50 1782.50 0
1982-10-07 Fracture 1779.50 1782.50 0
1983-01-12 Fracture 1779.50 1782.50 0
1993-12-24 Packing Device Capped w/Cement 1765.00 1773.00 0
1980-04-11 Acid Treatment 2208.10 2222.30 0
1980-06-28 Acid Treatment 2208.10 2222.30 0
1980-09-27 Perforation 2179.00 2183.00 7
1980-09-27 Perforation 2164.00 2169.00 7
1980-09-27 Perforation 2150.00 2160.00 4
1980-09-27 Perforation 2111.00 2113.00 7
1980-09-27 Perforation 2057.00 2059.00 7
1980-09-29 Acid Treatment 2179.00 2183.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1796 0.0 0.0 0.0
1983 7165 0.0 0.0 0.0
1984 7383 0.0 0.0 0.0
1985 8259 0.0 0.0 0.0
1986 4602 0.0 0.0 0.0
1987 3581 0.0 0.0 0.0
1988 3999 0.0 0.0 0.0
1989 3362 0.0 0.0 0.0
1990 3332 0.0 0.0 0.0
1991 684 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-19 Water Flow 2178.00 0.00

For data sources see[6]

References