X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134231704000

Well Details

Well ID: 0134231704000
Loading map...
Location: 00/04-17-013-23W4/0
Location Alias: 00/04-17-13-23 W4M
Location Alias 2: 00/04-17-013-23 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 23
Section: 17
County/Municipality: Vulcan County
Well Name: IMPERIAL CARMANGAY 4-17-13-23-4
Operator Name: Imperial Oil Limited
License Number: 0012628
License Date: 1956-11-08
License Status: Re-Entered
Spud Date: 1956-11-17
Final Drill Date: 1957-03-31
Well Total Depth: 2650.50 m
Surface Hole Latitude: 50.078972
Surface Hole Longitude: -113.118215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-11-08 Obtained License
1956-11-30 Drill Stem Test Performed
1956-12-22 Drill Stem Test Performed
1956-12-28 Drill Stem Test Performed
1957-01-02 Drill Stem Test Performed
1957-01-24 Drill Stem Test Performed
1957-01-28 Drill Stem Test Performed
1957-02-06 Drill Stem Test Performed
1957-02-19 Drill Stem Test Performed
1957-03-05 Drill Stem Test Performed
1957-03-08 Drill Stem Test Performed
1957-03-12 Drill Stem Test Performed
1957-03-17 Drill Stem Test Performed
1957-03-25 Drill Stem Test Performed
1957-03-26 Drill Stem Test Performed
1957-03-31 Finished Drilling
1957-03-31 Perforation Treatment Performed - Open-Hole Completion
1957-03-31 Well Mode changed to Drilled and Cased
1957-04-01 Well Log Performed
1957-04-05 Production Casing Operation Performed
1957-04-06 Well Log Performed
1957-05-08 Well Began Production
1957-05-08 Well Fluid changed to Crude Oil
1957-05-08 Well Mode changed to Pumping
1957-05-17 Perforation Treatment Performed - Bullet Perforation
1957-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-10-12 Perforation Treatment Performed - Cement Plug
1957-10-12 Well Abandoned
1957-10-12 Well Fluid changed to Crude Oil
1957-10-12 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-03-31 Open Hole/Barefoot Completion 1979.70 1996.40 0
1957-05-17 Bullet Perforation 1984.20 1991.00 10
1957-05-24 Acid Treatment 1979.70 1996.40 0
1957-10-12 Cement Plug 1935.50 1996.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References