X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134202111005

Well Details

Well ID: 0134202111005
Loading map...
Location: 00/11-21-013-20W4/5
Location Alias: 00/11-21-13-20 W4M
Location Alias 2: 00/11-21-013-20 W4/05
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 20
Section: 21
County/Municipality: Lethbridge County
Well Name: CPEC RETLAW 11-21-13-20
Operator Name: Crescent Point Energy Corp.
License Number: 0245193
License Date: 2000-11-25
License Status: Abandoned
Spud Date: 2000-12-16
Final Drill Date: 2000-12-22
Well Total Depth: 1299.00 m
Surface Hole Latitude: 50.101647
Surface Hole Longitude: -112.682223

For data sources see[1][2]

Well History

Date Event
2000-11-25 Obtained License
2000-12-17 Surface Casing Operation Performed
2000-12-22 Finished Drilling
2000-12-22 Well Log Performed
2000-12-22 Well Mode changed to Drilled and Cased
2000-12-23 Production Casing Operation Performed
2000-12-23 Rig Released
2000-12-23 Well Log Performed
2001-01-13 Perforation Treatment Performed - Jet Perforation
2001-01-13 Well Log Performed
2001-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-21 Perforation Treatment Performed - Jet Perforation
2001-01-21 Plug Back Performed
2001-01-21 Well Log Performed
2001-02-05 Well Log Performed
2001-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-22 Perforation Treatment Performed - Jet Perforation
2001-02-22 Plug Back Performed
2001-02-22 Well Log Performed
2001-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-01 Perforation Treatment Performed - Jet Perforation
2001-03-01 Plug Back Performed
2001-03-01 Well Log Performed
2001-03-08 Well Log Performed
2001-03-26 Perforation Treatment Performed - Fractured
2001-04-15 Perforation Treatment Performed - Jet Perforation
2001-04-15 Well Log Performed
2001-04-15 Well Mode changed to Drilled and Cased
2001-06-01 Well Began Production
2001-06-01 Well Fluid changed to Gas
2001-06-01 Well Mode changed to Flowing
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Suspended
2006-07-26 Well Fluid changed to Gas
2006-07-26 Well Mode changed to Flowing
2008-04-01 Well Log Performed
2011-10-01 Well Fluid changed to Gas
2011-10-01 Well Mode changed to Suspended
2011-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-16 Plug Back Performed
2011-11-16 Well Fluid changed to Gas
2011-11-16 Well Log Performed
2011-11-16 Well Mode changed to Abandoned Zone
2011-12-02 Well Abandoned
2011-12-02 Well Fluid changed to Gas
2011-12-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-13 Perforation 1265.00 1269.00 17
2001-04-15 Perforation 939.50 941.50 17
2011-11-16 Packing Device Capped w/Cement 927.00 935.00 0
2001-01-21 Packing Device Capped w/Cement 1261.00 1264.00 0
2001-01-21 Perforation 1254.50 1258.00 17
2001-02-22 Packing Device Capped w/Cement 1251.00 1254.00 0
2001-02-22 Perforation 1248.00 1250.50 17
2001-03-01 Packing Device Capped w/Cement 1243.00 1246.00 0
2001-03-01 Perforation 1236.50 1237.50 17
2001-03-26 Fracture 1236.50 1237.50 0
2001-04-15 Perforation 943.00 947.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 3594 0.0 0.0 0.0
2002 1417 0.0 0.0 0.0
2006 3692 0.0 0.0 0.0
2007 8024 0.0 0.0 0.0
2008 5644 0.0 0.0 0.0

For data sources see[5]

References