X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134201912003

Well Details

Well ID: 0134201912003
Loading map...
Location: 00/12-19-013-20W4/3
Location Alias: 00/12-19-13-20 W4M
Location Alias 2: 00/12-19-013-20 W4/03
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 20
Section: 19
County/Municipality: Lethbridge County
Well Name: CPEC RETLAW 12-19-13-20
Operator Name: Crescent Point Energy Corp.
License Number: 0260817
License Date: 2001-10-19
License Status: Abandoned
Spud Date: 2001-10-31
Final Drill Date: 2001-11-04
Well Total Depth: 1330.00 m
Surface Hole Latitude: 50.102166
Surface Hole Longitude: -112.732585

For data sources see[1][2]

Well History

Date Event
2001-10-19 Obtained License
2001-11-01 Surface Casing Operation Performed
2001-11-04 Finished Drilling
2001-11-04 Well Log Performed
2001-11-04 Well Mode changed to Drilled and Cased
2001-11-05 Production Casing Operation Performed
2001-11-05 Rig Released
2002-01-11 Perforation Treatment Performed - Jet Perforation
2002-01-11 Well Log Performed
2002-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-22 Plug Back Performed
2002-01-22 Well Log Performed
2002-01-23 Perforation Treatment Performed - Jet Perforation
2002-01-23 Well Log Performed
2002-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-02 Perforation Treatment Performed - Jet Perforation
2002-02-02 Plug Back Performed
2002-02-02 Well Log Performed
2002-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-11 Perforation Treatment Performed - Jet Perforation
2002-02-11 Plug Back Performed
2002-02-11 Well Log Performed
2002-02-11 Well Mode changed to Abandoned Zone
2002-02-22 Perforation Treatment Performed - Jet Perforation
2002-02-22 Well Log Performed
2002-02-26 Perforation Treatment Performed - Fractured
2006-08-24 Perforation Treatment Performed - Jet Perforation
2006-08-29 Perforation Treatment Performed - Jet Perforation
2006-08-29 Well Log Performed
2006-09-09 Perforation Treatment Performed - Fractured
2007-07-30 Well Structure changed to Commingled
2007-08-09 Perforation Treatment Performed - Fractured
2011-12-03 Perforation Treatment Performed - Cement Plug
2011-12-03 Plug Back Performed
2011-12-03 Well Mode changed to Abandoned Zone
2011-12-03 Well Structure changed to Commingled
2011-12-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-01-11 Perforation 1296.50 1300.00 17
2006-08-24 Perforation 596.00 600.00 17
2006-08-29 Perforation 932.00 934.00 13
2006-08-29 Perforation 921.00 923.00 13
2006-08-29 Perforation 911.00 913.00 13
2006-08-29 Perforation 899.00 901.00 13
2006-08-29 Perforation 867.00 869.00 13
2006-08-29 Perforation 844.00 846.00 13
2006-08-29 Perforation 838.00 840.00 13
2006-08-29 Perforation 820.00 822.00 13
2006-08-29 Perforation 809.00 811.00 13
2002-01-22 Packing Device Capped w/Cement 1286.00 1294.00 0
2006-08-29 Perforation 779.00 781.00 13
2006-08-29 Perforation 725.00 727.00 13
2006-08-29 Perforation 710.00 712.00 13
2006-08-29 Perforation 683.00 685.00 13
2006-08-29 Perforation 663.00 665.00 13
2006-08-29 Perforation 653.00 655.00 13
2006-08-29 Perforation 643.00 645.00 13
2006-08-29 Perforation 632.00 634.00 13
2006-08-29 Perforation 621.00 623.00 13
2006-09-09 Fracture 921.00 923.00 0
2002-01-23 Perforation 1001.50 1002.50 17
2006-09-09 Fracture 911.00 913.00 0
2006-09-09 Fracture 899.00 901.00 0
2006-09-09 Fracture 844.00 846.00 0
2006-09-09 Fracture 838.00 840.00 0
2006-09-09 Fracture 820.00 822.00 0
2006-09-09 Fracture 809.00 811.00 0
2007-08-09 Fracture 779.00 781.00 0
2007-08-09 Fracture 725.00 727.00 0
2007-08-09 Fracture 710.00 712.00 0
2007-08-09 Fracture 683.00 685.00 0
2002-02-02 Packing Device Capped w/Cement 987.00 995.00 0
2007-08-09 Fracture 663.00 665.00 0
2007-08-09 Fracture 653.00 655.00 0
2007-08-09 Fracture 643.00 645.00 0
2007-08-09 Fracture 632.00 634.00 0
2007-08-09 Fracture 621.00 623.00 0
2011-12-03 Cement Plug 106.20 987.80 0
2002-02-02 Perforation 596.00 600.00 17
2002-02-11 Packing Device Capped w/Cement 585.00 593.00 0
2002-02-11 Perforation 304.00 309.00 17
2002-02-22 Perforation 286.00 289.00 13
2002-02-26 Fracture 286.00 309.00 0

For data sources see[4]



References