X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134191308000

Well Details

Well ID: 0134191308000
Loading map...
Location: 00/08-13-013-19W4/0
Location Alias: 00/08-13-13-19 W4M
Location Alias 2: 00/08-13-013-19 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 19
Section: 13
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 8-13-13-19
Operator Name: SanLing Energy Ltd.
License Number: 0096925
License Date: 1982-08-05
License Status: Suspension
Spud Date: 1982-08-21
Final Drill Date: 1982-08-27
Well Total Depth: 1167.00 m
Surface Hole Latitude: 50.081027
Surface Hole Longitude: -112.463106

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-08-05 Obtained License
1982-08-27 Finished Drilling
1982-08-27 Well Mode changed to Drilled and Cased
1982-08-28 Drill Stem Test Performed
1982-08-30 Production Casing Operation Performed
1982-09-23 Perforation Treatment Performed - Jet Perforation
1982-11-01 Well Began Production
1982-11-01 Well Fluid changed to Crude Oil
1982-11-01 Well Mode changed to Flowing
1988-10-18 Perforation Treatment Performed - Jet Perforation
1988-10-18 Perforation Treatment Performed - Remedial Casing
1993-09-16 Well Fluid changed to Crude Oil
1993-09-16 Well Mode changed to Pumping
1997-10-31 Well Fluid changed to Crude Oil
1997-10-31 Well Mode changed to Suspended
2003-05-26 Well Log Performed
2003-05-27 Well Log Performed
2003-05-29 Well Log Performed
2003-11-01 Well Began Injection
2003-11-01 Well Fluid changed to Water
2003-11-01 Well Type changed to Injection
2014-10-02 Well Fluid changed to Water
2014-10-02 Well Mode changed to Suspended
2014-10-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-23 Perforation 1095.50 1096.20 13
1982-09-23 Perforation 1097.00 1098.00 13
1988-10-18 Perforation 385.00 385.30 13
1988-10-18 Remedial Casing Cementing 385.00 385.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1466 0.0 0.0 0.0
1983 3561 0.0 0.0 0.0
1984 4723 0.0 0.0 0.0
1985 4338 0.0 0.0 0.0
1986 3759 0.0 0.0 0.0
1987 3271 0.0 0.0 0.0
1988 4487 0.0 0.0 0.0
1989 6789 0.0 0.0 0.0
1990 7588 0.0 0.0 0.0
1991 8705 0.0 0.0 0.0
1992 8721 0.0 0.0 0.0
1993 7603 0.0 0.0 0.0
1994 8703 0.0 0.0 0.0
1995 8537 0.0 0.0 0.0
1996 6281 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-10-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References