If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134190811000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.071482,"lon":-112.568638,"icon":""}]} |
Location: 00/11-08-013-19W4/0 | |
Location Alias: 00/11-08-13-19 W4M | |
Location Alias 2: 00/11-08-013-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 19 | |
Section: 08 | |
County/Municipality: Lethbridge County | |
Well Name: LADD ET AL RETLAW 11-8-13-19 | |
Operator Name: Amax Petroleum Of Canada Inc. | |
License Number: 0061009 | |
License Date: 1976-11-05 | |
License Status: RecCertified | |
Spud Date: 1976-11-10 | |
Final Drill Date: 1976-11-15 | |
Well Total Depth: 1188.70 m | |
Surface Hole Latitude: 50.071482 | |
Surface Hole Longitude: -112.568638 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-11-05 | Obtained License |
1976-11-15 | Finished Drilling |
1976-11-17 | Drill Stem Test Performed |
1976-11-18 | Production Casing Operation Performed |
1976-12-16 | Perforation Treatment Performed - Jet Perforation |
1977-01-04 | Perforation Treatment Performed - Jet Perforation |
1977-01-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-01-18 | Perforation Treatment Performed - Jet Perforation |
1977-01-21 | Well Mode changed to Drilled and Cased |
1981-04-30 | Well Began Production |
1981-04-30 | Well Fluid changed to Gas |
1981-04-30 | Well Mode changed to Flowing |
1981-09-10 | Perforation Treatment Performed - Cement Squeeze |
1983-08-01 | Well Fluid changed to Gas |
1983-08-01 | Well Mode changed to Suspended |
1984-05-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-05-12 | Plug Back Performed |
1984-05-13 | Perforation Treatment Performed - Jet Perforation |
1984-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-08-04 | Perforation Treatment Performed - Jet Perforation |
1984-08-04 | Plug Back Performed |
1984-08-04 | Well Log Performed |
1984-08-18 | Well Fluid changed to Gas |
1984-08-18 | Well Mode changed to Flowing |
1985-01-01 | Well Fluid changed to Gas |
1985-01-01 | Well Mode changed to Suspended |
1987-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-05 | Plug Back Performed |
1987-09-05 | Well Fluid changed to Gas |
1987-09-05 | Well Log Performed |
1987-09-05 | Well Mode changed to Abandoned |
1987-09-06 | Perforation Treatment Performed - Jet Perforation |
1987-09-06 | Perforation Treatment Performed - Remedial Casing |
1987-09-06 | Well Log Performed |
1987-10-14 | Perforation Treatment Performed - Jet Perforation |
1987-10-14 | Perforation Treatment Performed - Remedial Casing |
1987-11-16 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-12-16 | Perforation | 890.30 | 891.80 | 7 |
1987-09-05 | Packing Device Capped w/Cement | 832.00 | 840.00 | 0 |
1987-09-06 | Perforation | 279.00 | 280.00 | 13 |
1987-09-06 | Remedial Casing Cementing | 279.00 | 280.00 | 0 |
1987-10-14 | Perforation | 209.00 | 210.00 | 13 |
1987-10-14 | Remedial Casing Cementing | 209.00 | 210.00 | 0 |
1977-01-04 | Perforation | 860.10 | 861.10 | 7 |
1977-01-06 | Acid Treatment | 860.10 | 861.10 | 0 |
1977-01-18 | Perforation | 846.10 | 847.30 | 7 |
1981-09-10 | Cement Squeeze | 846.10 | 861.10 | 0 |
1984-05-12 | Packing Device Capped w/Cement | 879.00 | 887.00 | 0 |
1984-05-13 | Perforation | 860.20 | 861.10 | 13 |
1984-08-04 | Packing Device Capped w/Cement | 852.00 | 859.00 | 0 |
1984-08-04 | Perforation | 846.10 | 847.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 3255 | 0.0 | 0.0 | 0.0 |
1982 | 3830 | 0.0 | 0.0 | 0.0 |
1984 | 761 | 0.0 | 0.0 | 0.0 |
For data sources see[5]