If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0134173616003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.132076,"lon":-112.193354,"icon":""}]} |
| Location: 00/16-36-013-17W4/3 | |
| Location Alias: 00/16-36-13-17 W4M | |
| Location Alias 2: 00/16-36-013-17 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 013 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 36 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: HARVEST ENCHANT 16-36-13-17 | |
| Operator Name: Razor Energy Corp. | |
| License Number: 0101903 | |
| License Date: 1983-06-27 | |
| License Status: Suspension | |
| Spud Date: 1983-07-15 | |
| Final Drill Date: 1983-07-21 | |
| Well Total Depth: 1090.00 m | |
| Surface Hole Latitude: 50.132076 | |
| Surface Hole Longitude: -112.193354 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-06-27 | Obtained License |
| 1983-07-17 | Kick Occurred |
| 1983-07-17 | Lost Circulation Occurred |
| 1983-07-18 | Kick Occurred |
| 1983-07-20 | Kick Occurred |
| 1983-07-21 | Finished Drilling |
| 1983-07-21 | Well Log Performed |
| 1983-07-21 | Well Mode changed to Drilled and Cased |
| 1983-07-23 | Drill Stem Test Performed |
| 1983-07-24 | Drill Stem Test Performed |
| 1983-07-27 | Production Casing Operation Performed |
| 1983-09-15 | Perforation Treatment Performed - Jet Perforation |
| 1983-09-29 | Perforation Treatment Performed - Jet Perforation |
| 1983-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-09-30 | Perforation Treatment Performed - Cement Squeeze |
| 1983-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-10-08 | Perforation Treatment Performed - Cement Squeeze |
| 1983-10-10 | Perforation Treatment Performed - Jet Perforation |
| 1983-10-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-07-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1984-07-04 | Plug Back Performed |
| 1984-07-05 | Perforation Treatment Performed - Jet Perforation |
| 1984-07-05 | Well Log Performed |
| 1984-07-13 | Perforation Treatment Performed - Fractured |
| 1984-07-17 | Perforation Treatment Performed - Jet Perforation |
| 1984-12-04 | Well Log Performed |
| 1984-12-17 | Well Log Performed |
| 1985-09-12 | Well Log Performed |
| 1985-09-14 | Perforation Treatment Performed - Jet Perforation |
| 1985-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-05-22 | Perforation Treatment Performed - Jet Perforation |
| 1990-06-11 | Well Began Production |
| 1990-06-11 | Well Fluid changed to Gas |
| 1990-06-11 | Well Mode changed to Flowing |
| 1997-03-03 | Well Log Performed |
| 1997-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-03-04 | Perforation Treatment Performed - Jet Perforation |
| 1997-03-04 | Plug Back Performed |
| 1997-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-03-05 | Plug Back Performed |
| 1997-03-06 | Perforation Treatment Performed - Jet Perforation |
| 1997-03-07 | Perforation Treatment Performed - Fractured |
| 1997-09-01 | Well Fluid changed to Gas |
| 1997-09-01 | Well Mode changed to Suspended |
| 2018-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2018-06-27 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-09-15 | Perforation | 1045.10 | 1046.80 | 7 |
| 1984-07-05 | Perforation | 1000.50 | 1006.50 | 4 |
| 1984-07-13 | Fracture | 1005.00 | 1006.50 | 0 |
| 1984-07-17 | Perforation | 984.00 | 984.00 | 1 |
| 1985-09-14 | Perforation | 1016.30 | 1017.20 | 13 |
| 1985-09-16 | Acid Treatment | 1016.30 | 1017.20 | 0 |
| 1990-05-22 | Perforation | 1016.20 | 1017.20 | 13 |
| 1997-03-04 | Packing Device Capped w/Cement | 982.00 | 990.00 | 0 |
| 1997-03-04 | Perforation | 765.30 | 765.40 | 2 |
| 1997-03-04 | Perforation | 765.00 | 766.00 | 14 |
| 1997-03-05 | Acid Treatment | 765.00 | 766.00 | 0 |
| 1983-09-29 | Perforation | 1050.80 | 1051.10 | 7 |
| 1997-03-05 | Packing Device Capped w/Cement | 752.00 | 760.00 | 0 |
| 1997-03-06 | Perforation | 667.00 | 670.00 | 13 |
| 1997-03-07 | Fracture | 667.00 | 670.00 | 0 |
| 2018-06-27 | Packing Device Capped w/Cement | 650.00 | 658.00 | 0 |
| 1983-09-30 | Acid Treatment | 1050.80 | 1051.10 | 0 |
| 1983-09-30 | Cement Squeeze | 1050.80 | 1051.10 | 0 |
| 1983-10-08 | Acid Treatment | 1045.10 | 1046.80 | 0 |
| 1983-10-08 | Cement Squeeze | 1045.10 | 1046.80 | 0 |
| 1983-10-10 | Perforation | 1045.00 | 1045.80 | 13 |
| 1983-10-11 | Acid Treatment | 1045.00 | 1045.80 | 0 |
| 1984-07-04 | Packing Device Capped w/Cement | 1019.50 | 1024.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 4367 | 0.0 | 0.0 | 0.0 |
| 1991 | 7823 | 0.0 | 0.0 | 0.0 |
| 1992 | 5289 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1983-07-17 | Kick | 607.00 | 607.00 |
| 1983-07-17 | Lost Circulation | 230.00 | 694.00 |
| 1983-07-18 | Kick | 763.00 | 763.00 |
| 1983-07-20 | Kick | 990.00 | 990.00 |
| 2018-06-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]