X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134173616002

Well Details

Well ID: 0134173616002
Loading map...
Location: 00/16-36-013-17W4/2
Location Alias: 00/16-36-13-17 W4M
Location Alias 2: 00/16-36-013-17 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 36
County/Municipality: Municipal District of Taber
Well Name: HARVEST ENCHANT 16-36-13-17
Operator Name: Razor Energy Corp.
License Number: 0101903
License Date: 1983-06-27
License Status: Suspension
Spud Date: 1983-07-15
Final Drill Date: 1983-07-21
Well Total Depth: 1090.00 m
Surface Hole Latitude: 50.132076
Surface Hole Longitude: -112.193354

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-06-27 Obtained License
1983-07-17 Kick Occurred
1983-07-17 Lost Circulation Occurred
1983-07-18 Kick Occurred
1983-07-20 Kick Occurred
1983-07-21 Finished Drilling
1983-07-21 Well Log Performed
1983-07-21 Well Mode changed to Drilled and Cased
1983-07-23 Drill Stem Test Performed
1983-07-24 Drill Stem Test Performed
1983-07-27 Production Casing Operation Performed
1983-09-15 Perforation Treatment Performed - Jet Perforation
1983-09-29 Perforation Treatment Performed - Jet Perforation
1983-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-30 Perforation Treatment Performed - Cement Squeeze
1983-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-08 Perforation Treatment Performed - Cement Squeeze
1983-10-10 Perforation Treatment Performed - Jet Perforation
1983-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-07-04 Plug Back Performed
1984-07-05 Perforation Treatment Performed - Jet Perforation
1984-07-05 Well Began Production
1984-07-05 Well Fluid changed to Gas
1984-07-05 Well Log Performed
1984-07-05 Well Mode changed to Flowing
1984-07-13 Perforation Treatment Performed - Fractured
1984-07-17 Perforation Treatment Performed - Jet Perforation
1984-12-04 Well Log Performed
1984-12-17 Well Log Performed
1985-03-07 Well Fluid changed to Gas
1985-03-07 Well Mode changed to Suspended
1985-09-12 Well Log Performed
1985-09-14 Perforation Treatment Performed - Jet Perforation
1985-09-14 Well Fluid changed to Gas
1985-09-14 Well Mode changed to Suspended
1985-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-12-28 Well Fluid changed to Gas
1988-12-28 Well Mode changed to Flowing
1990-05-17 Well Fluid changed to Gas
1990-05-17 Well Mode changed to Suspended
1990-05-22 Perforation Treatment Performed - Jet Perforation
1997-03-03 Well Log Performed
1997-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-04 Perforation Treatment Performed - Jet Perforation
1997-03-04 Plug Back Performed
1997-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-05 Plug Back Performed
1997-03-06 Perforation Treatment Performed - Jet Perforation
1997-03-07 Perforation Treatment Performed - Fractured
2018-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-27 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-15 Perforation 1045.10 1046.80 7
1984-07-05 Perforation 1000.50 1006.50 4
1984-07-13 Fracture 1005.00 1006.50 0
1984-07-17 Perforation 984.00 984.00 1
1985-09-14 Perforation 1016.30 1017.20 13
1985-09-16 Acid Treatment 1016.30 1017.20 0
1990-05-22 Perforation 1016.20 1017.20 13
1997-03-04 Packing Device Capped w/Cement 982.00 990.00 0
1997-03-04 Perforation 765.30 765.40 2
1997-03-04 Perforation 765.00 766.00 14
1997-03-05 Acid Treatment 765.00 766.00 0
1983-09-29 Perforation 1050.80 1051.10 7
1997-03-05 Packing Device Capped w/Cement 752.00 760.00 0
1997-03-06 Perforation 667.00 670.00 13
1997-03-07 Fracture 667.00 670.00 0
2018-06-27 Packing Device Capped w/Cement 650.00 658.00 0
1983-09-30 Acid Treatment 1050.80 1051.10 0
1983-09-30 Cement Squeeze 1050.80 1051.10 0
1983-10-08 Acid Treatment 1045.10 1046.80 0
1983-10-08 Cement Squeeze 1045.10 1046.80 0
1983-10-10 Perforation 1045.00 1045.80 13
1983-10-11 Acid Treatment 1045.00 1045.80 0
1984-07-04 Packing Device Capped w/Cement 1019.50 1024.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 469 0.0 0.0 0.0
1985 160 0.0 0.0 0.0
1988 49 0.0 0.0 0.0
1989 6864 0.0 0.0 0.0
1990 2467 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-07-17 Kick 607.00 607.00
1983-07-17 Lost Circulation 230.00 694.00
1983-07-18 Kick 763.00 763.00
1983-07-20 Kick 990.00 990.00
2018-06-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References