X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134173403004

Well Details

Well ID: 0134173403004
Loading map...
Location: 00/03-34-013-17W4/4
Location Alias: 00/03-34-13-17 W4M
Location Alias 2: 00/03-34-013-17 W4/04
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 34
County/Municipality: Municipal District of Taber
Well Name: HARVEST ENCHANT 3-34-13-17
Operator Name: Razor Energy Corp.
License Number: 0006529
License Date: 1953-06-03
License Status: Issued
Spud Date: 1953-06-09
Final Drill Date: 1953-08-12
Well Total Depth: 1483.20 m
Surface Hole Latitude: 50.122551
Surface Hole Longitude: -112.248056

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-03 Obtained License
1953-06-21 Drill Stem Test Performed
1953-06-22 Drill Stem Test Performed
1953-06-23 Drill Stem Test Performed
1953-06-25 Drill Stem Test Performed
1953-06-26 Drill Stem Test Performed
1953-06-29 Drill Stem Test Performed
1953-07-05 Drill Stem Test Performed
1953-07-06 Drill Stem Test Performed
1953-07-07 Drill Stem Test Performed
1953-07-08 Drill Stem Test Performed
1953-07-09 Drill Stem Test Performed
1953-07-10 Drill Stem Test Performed
1953-07-12 Drill Stem Test Performed
1953-08-05 Drill Stem Test Performed
1953-08-12 Drill Stem Test Performed
1953-08-12 Finished Drilling
1953-08-13 Production Casing Operation Performed
1955-08-14 Perforation Treatment Performed - Jet Perforation
1964-03-31 Well Log Performed
1964-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-06-23 Perforation Treatment Performed - Jet Perforation
1964-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-03 Perforation Treatment Performed - Jet Perforation
1974-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-07 Perforation Treatment Performed - Jet Perforation
1975-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-08 Perforation Treatment Performed - Fractured
1981-07-08 Perforation Treatment Performed - Cement Squeeze
1992-11-05 Well Log Performed
1992-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-06 Plug Back Performed
1992-11-07 Perforation Treatment Performed - Jet Perforation
1992-11-07 Well Log Performed
1995-11-05 Perforation Treatment Performed - Cement Squeeze
1995-11-08 Perforation Treatment Performed - Jet Perforation
1995-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-10 Perforation Treatment Performed - Cement Squeeze
1995-11-17 Perforation Treatment Performed - Jet Perforation
1995-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-23 Well Log Performed
1995-11-24 Perforation Treatment Performed - Fractured
1995-11-24 Perforation Treatment Performed - Jet Perforation
1995-11-24 Well Log Performed
1995-11-24 Well Mode changed to Drilled and Cased
1995-12-09 Well Began Production
1995-12-09 Well Fluid changed to Gas
1995-12-09 Well Mode changed to Flowing
2004-10-01 Well Fluid changed to Gas
2004-10-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-08-14 Perforation 1030.20 1033.30 13
1975-01-08 Fracture 1009.80 1011.00 0
1981-07-08 Cement Squeeze 805.60 806.80 0
1992-11-06 Packing Device Capped w/Cement 932.00 940.00 0
1992-11-06 Packing Device Capped w/Cement 787.00 795.00 0
1992-11-07 Perforation 762.00 765.00 14
1995-11-05 Cement Squeeze 762.00 765.00 0
1995-11-08 Perforation 805.60 806.80 7
1995-11-10 Acid Treatment 805.60 806.80 0
1995-11-10 Cement Squeeze 805.60 806.80 0
1995-11-17 Perforation 1009.80 1011.00 7
1964-06-23 Packing Device Capped w/Cement 1018.00 1018.00 0
1995-11-23 Packing Device Capped w/Cement 982.00 990.00 0
1995-11-24 Perforation 954.00 960.00 7
1995-11-24 Perforation 962.50 967.00 7
1995-11-24 Fracture 954.00 967.00 0
1964-06-23 Perforation 1009.80 1011.00 7
1964-06-25 Acid Treatment 1009.80 1011.00 0
1974-10-03 Perforation 805.60 806.80 7
1974-10-04 Acid Treatment 805.60 806.80 0
1974-10-06 Acid Treatment 805.60 806.80 0
1975-01-07 Perforation 1009.80 1011.00 7
1975-01-08 Acid Treatment 1009.80 1011.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 701 0.0 0.0 0.0
1996 6416 0.0 0.0 0.0
1997 8432 0.0 0.0 0.0
1998 8480 0.0 0.0 0.0
1999 8698 0.0 0.0 0.0
2000 8123 0.0 0.0 0.0
2001 8498 0.0 0.0 0.0
2002 8563 0.0 0.0 0.0
2003 8402 0.0 0.0 0.0
2004 8191 0.0 0.0 0.0
2005 8707 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8629 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 8565 0.0 0.0 0.0
2010 8580 0.0 0.0 0.0
2011 6244 0.0 0.0 0.0
2012 8681 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8710 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8501 0.0 0.0 0.0
2018 8687 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References