X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134173403002

Well Details

Well ID: 0134173403002
Loading map...
Location: 00/03-34-013-17W4/2
Location Alias: 00/03-34-13-17 W4M
Location Alias 2: 00/03-34-013-17 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 34
County/Municipality: Municipal District of Taber
Well Name: HARVEST ENCHANT 3-34-13-17
Operator Name: Razor Energy Corp.
License Number: 0006529
License Date: 1953-06-03
License Status: Issued
Spud Date: 1953-06-09
Final Drill Date: 1953-08-12
Well Total Depth: 1483.20 m
Surface Hole Latitude: 50.122551
Surface Hole Longitude: -112.248056

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-03 Obtained License
1953-06-21 Drill Stem Test Performed
1953-06-22 Drill Stem Test Performed
1953-06-23 Drill Stem Test Performed
1953-06-25 Drill Stem Test Performed
1953-06-26 Drill Stem Test Performed
1953-06-29 Drill Stem Test Performed
1953-07-05 Drill Stem Test Performed
1953-07-06 Drill Stem Test Performed
1953-07-07 Drill Stem Test Performed
1953-07-08 Drill Stem Test Performed
1953-07-09 Drill Stem Test Performed
1953-07-10 Drill Stem Test Performed
1953-07-12 Drill Stem Test Performed
1953-08-05 Drill Stem Test Performed
1953-08-12 Drill Stem Test Performed
1953-08-12 Finished Drilling
1953-08-12 Well Mode changed to Drilled and Cased
1953-08-13 Production Casing Operation Performed
1955-08-14 Perforation Treatment Performed - Jet Perforation
1964-03-31 Well Log Performed
1964-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-06-23 Perforation Treatment Performed - Jet Perforation
1964-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-26 Well Began Production
1964-06-26 Well Fluid changed to Gas
1964-06-26 Well Mode changed to Flowing
1974-10-03 Perforation Treatment Performed - Jet Perforation
1974-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-07 Perforation Treatment Performed - Jet Perforation
1975-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-08 Perforation Treatment Performed - Fractured
1981-07-08 Perforation Treatment Performed - Cement Squeeze
1983-10-25 Well Fluid changed to Gas
1983-10-25 Well Mode changed to Flowing
1992-11-05 Well Log Performed
1992-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-06 Plug Back Performed
1992-11-06 Well Fluid changed to Gas
1992-11-06 Well Mode changed to Abandoned Zone
1992-11-07 Perforation Treatment Performed - Jet Perforation
1992-11-07 Well Log Performed
1995-11-05 Perforation Treatment Performed - Cement Squeeze
1995-11-08 Perforation Treatment Performed - Jet Perforation
1995-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-10 Perforation Treatment Performed - Cement Squeeze
1995-11-17 Perforation Treatment Performed - Jet Perforation
1995-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-23 Well Log Performed
1995-11-24 Perforation Treatment Performed - Fractured
1995-11-24 Perforation Treatment Performed - Jet Perforation
1995-11-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-08-14 Perforation 1030.20 1033.30 13
1975-01-08 Fracture 1009.80 1011.00 0
1981-07-08 Cement Squeeze 805.60 806.80 0
1992-11-06 Packing Device Capped w/Cement 932.00 940.00 0
1992-11-06 Packing Device Capped w/Cement 787.00 795.00 0
1992-11-07 Perforation 762.00 765.00 14
1995-11-05 Cement Squeeze 762.00 765.00 0
1995-11-08 Perforation 805.60 806.80 7
1995-11-10 Acid Treatment 805.60 806.80 0
1995-11-10 Cement Squeeze 805.60 806.80 0
1995-11-17 Perforation 1009.80 1011.00 7
1964-06-23 Packing Device Capped w/Cement 1018.00 1018.00 0
1995-11-23 Packing Device Capped w/Cement 982.00 990.00 0
1995-11-24 Perforation 954.00 960.00 7
1995-11-24 Perforation 962.50 967.00 7
1995-11-24 Fracture 954.00 967.00 0
1964-06-23 Perforation 1009.80 1011.00 7
1964-06-25 Acid Treatment 1009.80 1011.00 0
1974-10-03 Perforation 805.60 806.80 7
1974-10-04 Acid Treatment 805.60 806.80 0
1974-10-06 Acid Treatment 805.60 806.80 0
1975-01-07 Perforation 1009.80 1011.00 7
1975-01-08 Acid Treatment 1009.80 1011.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 2496 0.0 0.0 0.0
1970 4164 0.0 0.0 0.0
1971 6929 0.0 0.0 0.0
1972 8113 0.0 0.0 0.0
1973 6171 0.0 0.0 0.0
1974 5991 0.0 0.0 0.0
1975 2145 0.0 0.0 0.0
1976 5929 0.0 0.0 0.0
1977 4493 0.0 0.0 0.0
1978 1921 0.0 0.0 0.0
1979 5576 0.0 0.0 0.0
1980 4245 0.0 0.0 0.0
1981 2416 0.0 0.0 0.0
1982 1052 0.0 0.0 0.0
1983 208 0.0 0.0 0.0
1984 1390 0.0 0.0 0.0
1985 3907 0.0 0.0 0.0
1986 5534 0.0 0.0 0.0
1987 2363 0.0 0.0 0.0
1988 3554 0.0 0.0 0.0
1989 6387 0.0 0.0 0.0
1990 8082 0.0 0.0 0.0
1991 7847 0.0 0.0 0.0
1992 5271 0.0 0.0 0.0

For data sources see[5]

References