X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134172506030

Well Details

Well ID: 0134172506030
Loading map...
Location: 03/06-25-013-17W4/0
Location Alias: 03/06-25-13-17 W4M
Location Alias 2: 03/06-25-013-17 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 25
County/Municipality: Municipal District of Taber
Well Name: SLE 103 ENCHANT 6-25-13-17
Operator Name: SanLing Energy Ltd.
License Number: 0278794
License Date: 2002-12-17
License Status: Issued
Spud Date: 2002-12-29
Final Drill Date: 2003-01-01
Well Total Depth: 1081.00 m
Surface Hole Latitude: 50.111730
Surface Hole Longitude: -112.202063

For data sources see[1][2]

Well History

Date Event
2002-12-17 Obtained License
2002-12-31 Surface Casing Operation Performed
2003-01-01 Finished Drilling
2003-01-01 Well Log Performed
2003-01-01 Well Mode changed to Drilled and Cased
2003-01-03 Production Casing Operation Performed
2003-01-03 Rig Released
2003-02-04 Perforation Treatment Performed - Jet Perforation
2003-02-04 Well Log Performed
2003-02-25 Well Began Production
2003-02-25 Well Fluid changed to Crude Oil
2003-02-25 Well Mode changed to Pumping
2004-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-12 Perforation Treatment Performed - Jet Perforation
2004-11-12 Plug Back Performed
2004-11-12 Well Fluid changed to Crude Oil
2004-11-12 Well Log Performed
2004-11-12 Well Mode changed to Abandoned Zone
2004-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-13 Perforation Treatment Performed - Jet Perforation
2004-11-13 Plug Back Performed
2004-11-13 Well Log Performed
2004-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-14 Perforation Treatment Performed - Jet Perforation
2004-11-14 Plug Back Performed
2004-11-14 Well Log Performed
2004-11-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-04 Perforation 1046.00 1047.00 17
2004-11-12 Packing Device Capped w/Cement 1031.00 1039.00 0
2004-11-12 Perforation 952.00 954.00 17
2004-11-13 Packing Device Capped w/Cement 940.00 948.00 0
2004-11-13 Perforation 820.00 822.00 17
2004-11-14 Packing Device Capped w/Cement 800.00 818.00 0
2004-11-14 Perforation 664.50 669.50 17
2004-11-16 Fracture 664.50 669.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5556 0.0 0.0 0.0

For data sources see[5]

References