X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134171811002

Well Details

Well ID: 0134171811002
Loading map...
Location: 00/11-18-013-17W4/2
Location Alias: 00/11-18-13-17 W4M
Location Alias 2: 00/11-18-013-17 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 18
County/Municipality: Municipal District of Taber
Well Name: SLE ENCHANT 11-18-13-17
Operator Name: SanLing Energy Ltd.
License Number: 0044724
License Date: 1973-01-04
License Status: Suspension
Spud Date: 1973-01-13
Final Drill Date: 1973-01-18
Well Total Depth: 1115.60 m
Surface Hole Latitude: 50.087099
Surface Hole Longitude: -112.317761

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-01-04 Obtained License
1973-01-18 Drill Stem Test Performed
1973-01-18 Finished Drilling
1973-01-18 Production Casing Operation Performed
1973-01-18 Well Mode changed to Drilled and Cased
1973-01-19 Drill Stem Test Performed
1973-01-20 Drill Stem Test Performed
1975-08-09 Perforation Treatment Performed - Jet Perforation
1985-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-01 Perforation Treatment Performed - Cement Squeeze
1985-06-03 Well Log Performed
1985-06-04 Perforation Treatment Performed - Jet Perforation
1985-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-31 Well Log Performed
2003-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-14 Plug Back Performed
2003-10-16 Perforation Treatment Performed - Jet Perforation
2003-10-24 Perforation Treatment Performed - Fractured
2003-10-29 Well Began Production
2003-10-29 Well Fluid changed to Gas
2003-10-29 Well Mode changed to Flowing
2012-06-01 Well Fluid changed to Gas
2012-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-09 Perforation 917.10 919.30 13
2003-10-24 Fracture 698.90 700.10 0
1985-06-01 Acid Treatment 917.10 919.30 0
1985-06-01 Cement Squeeze 917.10 919.30 0
1985-06-04 Perforation 916.80 918.30 13
1985-06-05 Acid Treatment 916.80 918.30 0
2003-10-14 Packing Device Capped w/Cement 899.00 907.00 0
2003-10-16 Perforation 691.90 694.90 26
2003-10-16 Perforation 698.90 700.10 26
2003-10-24 Fracture 691.90 694.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1311 0.0 0.0 0.0
2004 7926 0.0 0.0 0.0
2005 8310 0.0 0.0 0.0
2006 7501 0.0 0.0 0.0
2007 5893 0.0 0.0 0.0

For data sources see[5]

References