X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134170915020

Well Details

Well ID: 0134170915020
Loading map...
Location: 02/15-09-013-17W4/0
Location Alias: 02/15-09-13-17 W4M
Location Alias 2: 02/15-09-013-17 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 09
County/Municipality: Municipal District of Taber
Well Name: SLE 102 ENCHANT 15-9-13-17
Operator Name: SanLing Energy Ltd.
License Number: 0436755
License Date: 2011-09-13
License Status: Amended
Spud Date: 2011-10-02
Final Drill Date: 2011-10-11
Well Total Depth: 2050.00 m
Surface Hole Latitude: 50.073751
Surface Hole Longitude: -112.278456

For data sources see[1][2]

Well History

Date Event
2011-09-13 Obtained License
2011-10-02 Well Log Performed
2011-10-03 Surface Casing Operation Performed
2011-10-05 Direction Drilling Operation Performed - Horizontal
2011-10-06 Intermediate Casing Operation Performed
2011-10-11 Finished Drilling
2011-10-11 Well Mode changed to Drilled and Cased
2011-10-12 Well Log Performed
2011-10-14 Liner Casing Operation Performed
2011-10-14 Rig Released
2011-11-14 Well Log Performed
2011-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-30 Perforation Treatment Performed - Open-Hole Completion
2012-01-21 Well Began Production
2012-01-21 Well Fluid changed to Crude Oil
2012-01-21 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-05 758.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-30 Open Hole/Barefoot Completion 2045.00 2050.00 0
2011-11-30 Multi-Stage Fracture 1346.00 1346.10 0
2011-11-30 Multi-Stage Fracture 1260.60 1260.70 0
2011-11-30 Multi-Stage Fracture 1178.40 1178.50 0
2011-11-30 Multi-Stage Fracture 2009.00 2009.10 0
2011-11-30 Multi-Stage Fracture 1943.50 1943.60 0
2011-11-30 Multi-Stage Fracture 1858.30 1858.40 0
2011-11-30 Multi-Stage Fracture 1773.10 1773.20 0
2011-11-30 Multi-Stage Fracture 1674.50 1674.60 0
2011-11-30 Multi-Stage Fracture 1602.70 1602.80 0
2011-11-30 Multi-Stage Fracture 1516.90 1517.00 0
2011-11-30 Multi-Stage Fracture 1431.50 1431.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7462 0.0 0.0 0.0
2013 4880 0.0 0.0 0.0
2014 8371 0.0 0.0 0.0
2015 7478 0.0 0.0 0.0
2016 8721 0.0 0.0 0.0
2017 1176 0.0 0.0 0.0
2018 744 0.0 0.0 0.0
2019 1487 0.0 0.0 0.0

For data sources see[6]

References