If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0134170802000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.063472,"lon":-112.285272,"icon":""}]} |
| Location: 00/02-08-013-17W4/0 | |
| Location Alias: 00/02-08-13-17 W4M | |
| Location Alias 2: 00/02-08-013-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 013 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 08 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: SLE ENCHANT 2-8-13-17 | |
| Operator Name: SanLing Energy Ltd. | |
| License Number: 0443695 | |
| License Date: 2012-02-01 | |
| License Status: Issued | |
| Spud Date: 2012-02-13 | |
| Final Drill Date: 2012-02-17 | |
| Well Total Depth: 1120.00 m | |
| Surface Hole Latitude: 50.063472 | |
| Surface Hole Longitude: -112.285272 |
| Date | Event |
|---|---|
| 2012-02-01 | Obtained License |
| 2012-02-14 | Surface Casing Operation Performed |
| 2012-02-16 | Direction Drilling Operation Performed - Deviate |
| 2012-02-17 | Finished Drilling |
| 2012-02-17 | Well Log Performed |
| 2012-02-17 | Well Mode changed to Drilled and Cased |
| 2012-02-18 | Production Casing Operation Performed |
| 2012-02-18 | Rig Released |
| 2012-02-18 | Well Log Performed |
| 2012-03-03 | Perforation Treatment Performed - Jet Perforation |
| 2012-03-03 | Well Log Performed |
| 2012-03-07 | Perforation Treatment Performed - Fractured |
| 2012-05-12 | Well Began Production |
| 2012-05-12 | Well Fluid changed to Crude Oil |
| 2012-05-12 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-13 | Precision Drilling Corporation | 179 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-16 | 584.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-03-03 | Perforation | 1048.50 | 1050.50 | 20 |
| 2012-03-07 | Fracture | 1048.50 | 1050.50 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 4610 | 0.0 | 0.0 | 0.0 |
| 2013 | 8077 | 0.0 | 0.0 | 0.0 |
| 2014 | 8560 | 0.0 | 0.0 | 0.0 |
| 2015 | 8625 | 0.0 | 0.0 | 0.0 |
| 2016 | 6746 | 0.0 | 0.0 | 0.0 |
| 2017 | 8636 | 0.0 | 0.0 | 0.0 |
| 2018 | 7471 | 0.0 | 0.0 | 0.0 |
| 2019 | 4022 | 0.0 | 0.0 | 0.0 |
| 2020 | 1631 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-03-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]