If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0134170711000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/11-07-013-17W4/0 | |
| Location Alias: 00/11-07-13-17 W4M | |
| Location Alias 2: 00/11-07-013-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 013 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 07 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: SLE HZ ENCHANT 11-7-13-17 | |
| Operator Name: SanLing Energy Ltd. | |
| License Number: 0443058 | |
| License Date: 2012-01-19 | |
| License Status: Amended | |
| Spud Date: 2012-02-03 | |
| Final Drill Date: 2012-02-10 | |
| Well Total Depth: 2142.00 m | |
| Surface Hole Latitude: 50.074313 | |
| Surface Hole Longitude: -112.301213 |
| Date | Event |
|---|---|
| 2012-01-19 | Obtained License |
| 2012-02-03 | Well Log Performed |
| 2012-02-04 | Surface Casing Operation Performed |
| 2012-02-05 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-07 | Intermediate Casing Operation Performed |
| 2012-02-10 | Finished Drilling |
| 2012-02-10 | Well Mode changed to Drilled and Cased |
| 2012-02-11 | Liner Casing Operation Performed |
| 2012-02-12 | Rig Released |
| 2012-02-26 | Well Log Performed |
| 2012-02-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-29 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-05-17 | Well Began Production |
| 2012-05-17 | Well Fluid changed to Crude Oil |
| 2012-05-17 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-03 | Precision Drilling Corporation | 179 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-05 | 735.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-02-29 | Open Hole/Barefoot Completion | 2138.00 | 2142.00 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1520.50 | 1520.60 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1447.00 | 1447.10 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1373.40 | 1373.50 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1299.90 | 1300.00 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1226.40 | 1226.50 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1152.80 | 1152.90 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 2100.40 | 2100.50 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 2033.80 | 2033.90 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1960.20 | 1960.30 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1886.70 | 1886.80 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1813.20 | 1813.30 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1739.70 | 1739.80 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1666.10 | 1666.20 | 0 |
| 2012-02-29 | Multi-Stage Fracture | 1592.60 | 1592.70 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3309 | 0.0 | 0.0 | 0.0 |
| 2013 | 2295 | 0.0 | 0.0 | 0.0 |
| 2014 | 8603 | 0.0 | 0.0 | 0.0 |
| 2015 | 8639 | 0.0 | 0.0 | 0.0 |
| 2016 | 8505 | 0.0 | 0.0 | 0.0 |
| 2017 | 8100 | 0.0 | 0.0 | 0.0 |
| 2018 | 8107 | 0.0 | 0.0 | 0.0 |
| 2019 | 7335 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]