If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0134170315000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.052094,"lon":-112.25569,"icon":""}]} |
| Location: 00/15-03-013-17W4/0 | |
| Location Alias: 00/15-03-13-17 W4M | |
| Location Alias 2: 00/15-03-013-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 013 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 03 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: SLE ENCHANT 15-3-13-17 | |
| Operator Name: SanLing Energy Ltd. | |
| License Number: 0436591 | |
| License Date: 2011-09-07 | |
| License Status: Issued | |
| Spud Date: 2011-09-17 | |
| Final Drill Date: 2011-09-27 | |
| Well Total Depth: 2147.00 m | |
| Surface Hole Latitude: 50.052094 | |
| Surface Hole Longitude: -112.255690 |
| Date | Event |
|---|---|
| 2011-09-07 | Obtained License |
| 2011-09-18 | Surface Casing Operation Performed |
| 2011-09-20 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-22 | Well Log Performed |
| 2011-09-23 | Intermediate Casing Operation Performed |
| 2011-09-27 | Finished Drilling |
| 2011-09-27 | Well Log Performed |
| 2011-09-27 | Well Mode changed to Drilled and Cased |
| 2011-09-30 | Liner Casing Operation Performed |
| 2011-09-30 | Rig Released |
| 2011-10-15 | Well Log Performed |
| 2011-10-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-10-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-12-15 | Well Began Production |
| 2011-12-15 | Well Fluid changed to Crude Oil |
| 2011-12-15 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-09-20 | 741.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-21 | Open Hole/Barefoot Completion | 2142.00 | 2147.00 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1415.00 | 1415.10 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1328.90 | 1329.00 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1255.60 | 1255.70 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1182.40 | 1182.50 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 2108.00 | 2108.10 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 2017.40 | 2017.50 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1931.20 | 1931.30 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1845.30 | 1845.40 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1759.30 | 1759.40 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1673.30 | 1673.40 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1587.20 | 1587.30 | 0 |
| 2011-10-21 | Multi-Stage Fracture | 1501.10 | 1501.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 229 | 0.0 | 0.0 | 0.0 |
| 2012 | 6836 | 0.0 | 0.0 | 0.0 |
| 2013 | 8052 | 0.0 | 0.0 | 0.0 |
| 2014 | 8265 | 0.0 | 0.0 | 0.0 |
| 2015 | 8699 | 0.0 | 0.0 | 0.0 |
| 2016 | 8721 | 0.0 | 0.0 | 0.0 |
| 2017 | 8484 | 0.0 | 0.0 | 0.0 |
| 2018 | 8653 | 0.0 | 0.0 | 0.0 |
| 2019 | 8726 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]