X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134170306002

Well Details

Well ID: 0134170306002
Loading map...
Location: 00/06-03-013-17W4/2
Location Alias: 00/06-03-13-17 W4M
Location Alias 2: 00/06-03-013-17 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 17
Section: 03
County/Municipality: Municipal District of Taber
Well Name: LITTLE ROCK ENCHANT 6-3-13-17
Operator Name: Razor Energy Corp.
License Number: 0182517
License Date: 1995-11-27
License Status: Suspension
Spud Date: 1995-12-03
Final Drill Date: 1995-12-06
Well Total Depth: 1068.00 m
Surface Hole Latitude: 50.054856
Surface Hole Longitude: -112.248959

For data sources see[1][2]

Well History

Date Event
1995-11-27 Obtained License
1995-12-05 Surface Casing Operation Performed
1995-12-06 Finished Drilling
1995-12-06 Well Log Performed
1995-12-06 Well Mode changed to Drilled and Cased
1995-12-07 Drill Stem Test Performed
1995-12-08 Production Casing Operation Performed
1995-12-08 Rig Released
1995-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-14 Perforation Treatment Performed - Jet Perforation
1995-12-14 Plug Back Performed
1995-12-15 Perforation Treatment Performed - Jet Perforation
1995-12-16 Perforation Treatment Performed - Jet Perforation
1996-03-22 Well Began Production
1996-03-22 Well Fluid changed to Gas
1996-03-22 Well Mode changed to Flowing
1996-09-04 Perforation Treatment Performed - Cement Squeeze
1996-09-04 Plug Back Performed
1996-09-04 Well Fluid changed to Gas
1996-09-04 Well Mode changed to Abandoned Zone
1996-09-07 Perforation Treatment Performed - Cement Squeeze
1996-09-07 Plug Back Performed
1996-09-09 Perforation Treatment Performed - Jet Perforation
1996-09-11 Perforation Treatment Performed - Fractured
2004-06-12 Well Log Performed
2004-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-12 Perforation Treatment Performed - Jet Perforation
2004-07-12 Plug Back Performed
2004-07-13 Perforation Treatment Performed - Fractured
2015-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-16 Plug Back Performed
2015-04-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-12-14 Perforation 975.50 977.50 13
1996-09-09 Perforation 978.50 981.00 13
1996-09-11 Fracture 975.50 981.00 0
2004-07-12 Packing Device Capped w/Cement 959.00 967.00 0
2004-07-12 Perforation 895.00 896.00 20
2004-07-13 Fracture 895.00 896.00 0
2015-04-16 Packing Device Capped w/Cement 876.00 886.00 0
2015-04-16 Packing Device Capped w/Cement 748.00 758.00 0
1995-12-14 Perforation 978.50 981.00 13
1995-12-14 Packing Device Capped w/Cement 966.00 974.00 0
1995-12-14 Perforation 895.00 896.00 13
1995-12-15 Perforation 763.50 765.00 13
1995-12-16 Perforation 763.50 765.00 13
1996-09-04 Cement Squeeze 763.50 765.00 0
1996-09-07 Cement Squeeze 895.00 896.00 0
1996-09-09 Perforation 975.50 977.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3347 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-04-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References