X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134161913002

Well Details

Well ID: 0134161913002
Loading map...
Location: 00/13-19-013-16W4/2
Location Alias: 00/13-19-13-16 W4M
Location Alias 2: 00/13-19-013-16 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 16
Section: 19
County/Municipality: Municipal District of Taber
Well Name: HARVEST ENCHANT 13-19-13-16
Operator Name: Razor Energy Corp.
License Number: 0006221
License Date: 1953-03-20
License Status: Abandoned
Spud Date: 1953-04-14
Final Drill Date: 1953-05-15
Well Total Depth: 1106.40 m
Surface Hole Latitude: 50.104280
Surface Hole Longitude: -112.185393

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-03-20 Obtained License
1953-04-23 Drill Stem Test Performed
1953-04-24 Drill Stem Test Performed
1953-04-25 Drill Stem Test Performed
1953-04-28 Drill Stem Test Performed
1953-05-02 Drill Stem Test Performed
1953-05-04 Drill Stem Test Performed
1953-05-05 Drill Stem Test Performed
1953-05-06 Drill Stem Test Performed
1953-05-07 Drill Stem Test Performed
1953-05-09 Drill Stem Test Performed
1953-05-12 Drill Stem Test Performed
1953-05-15 Finished Drilling
1953-05-15 Production Casing Operation Performed
1953-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-05-23 Perforation Treatment Performed - Bullet Perforation
1953-05-23 Perforation Treatment Performed - Cement Squeeze
1953-05-27 Perforation Treatment Performed - Jet Perforation
1953-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-05-30 Perforation Treatment Performed - Cement Plug
1953-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-05-31 Perforation Treatment Performed - Jet Perforation
1953-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1953-06-18 Perforation Treatment Performed - Jet Perforation
1953-06-28 Perforation Treatment Performed - Cement Squeeze
1953-06-28 Perforation Treatment Performed - Jet Perforation
1953-07-05 Perforation Treatment Performed - Cement Squeeze
1953-07-05 Perforation Treatment Performed - Jet Perforation
1953-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-07-14 Perforation Treatment Performed - Jet Perforation
1968-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-06-01 Perforation Treatment Performed - Jet Perforation
1968-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-06-05 Perforation Treatment Performed - Fractured
1968-06-06 Well Mode changed to Drilled and Cased
1974-06-15 Perforation Treatment Performed - Cement Squeeze
1974-06-19 Perforation Treatment Performed - Cement Squeeze
1974-06-20 Perforation Treatment Performed - Jet Perforation
1974-09-14 Perforation Treatment Performed - Jet Perforation
1974-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-20 Well Mode changed to Drilled and Cased
1976-11-04 Well Began Production
1976-11-04 Well Fluid changed to Gas
1976-11-04 Well Mode changed to Flowing
1978-05-29 Well Fluid changed to Gas
1978-05-29 Well Mode changed to Suspended
1980-07-08 Well Fluid changed to Crude Oil
1980-07-08 Well Mode changed to Flowing
1987-09-12 Well Fluid changed to Crude Oil
1987-09-12 Well Mode changed to Suspended
1988-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-13 Well Abandoned
1988-01-13 Well Fluid changed to Crude Oil
1988-01-13 Well Log Performed
1988-01-13 Well Mode changed to Abandoned
1988-01-14 Well Log Performed
1988-01-15 Well Log Performed
1988-01-18 Perforation Treatment Performed - Jet Perforation
1988-01-18 Well Log Performed
1988-01-19 Perforation Treatment Performed - Cement Squeeze
1989-01-14 Well Log Performed
1989-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-15 Perforation Treatment Performed - Cement Squeeze
1989-01-15 Perforation Treatment Performed - Jet Perforation
1989-01-15 Well Log Performed
1989-01-16 Perforation Treatment Performed - Jet Perforation
1989-01-16 Well Log Performed
1989-01-18 Perforation Treatment Performed - Cement Squeeze
1989-01-19 Perforation Treatment Performed - Jet Perforation
1989-01-19 Perforation Treatment Performed - Remedial Casing
1989-01-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-23 Bullet Perforation 1034.50 1037.80 13
1953-06-18 Perforation 1038.50 1040.30 13
1953-06-18 Acid Treatment 1038.50 1040.30 0
1953-06-18 Packing Device Capped w/Cement 1037.80 1037.80 0
1953-06-28 Perforation 1030.50 1032.70 13
1953-06-28 Cement Squeeze 1030.50 1032.70 0
1953-07-05 Perforation 1029.30 1030.20 13
1953-07-05 Cement Squeeze 1029.30 1030.20 0
1953-07-14 Perforation 1036.90 1038.80 13
1953-07-14 Acid Treatment 1036.90 1038.80 0
1968-05-31 Packing Device Capped w/Cement 978.40 986.00 0
1953-05-23 Acid Treatment 1034.50 1037.80 0
1968-06-01 Perforation 966.20 969.30 3
1968-06-02 Acid Treatment 966.20 969.30 0
1968-06-05 Fracture 966.20 969.30 0
1974-06-15 Cement Squeeze 966.20 969.30 0
1974-06-19 Cement Squeeze 966.20 969.30 0
1974-06-20 Perforation 1036.90 1038.80 13
1974-09-14 Perforation 1025.30 1027.80 3
1974-09-14 Perforation 1029.00 1030.20 3
1974-09-20 Acid Treatment 1025.30 1030.20 0
1988-01-13 Packing Device Capped w/Cement 996.00 1004.00 0
1953-05-23 Cement Squeeze 1034.50 1037.80 0
1988-01-18 Perforation 750.00 751.00 13
1988-01-19 Cement Squeeze 750.00 751.00 0
1989-01-15 Perforation 751.00 752.00 13
1989-01-15 Acid Treatment 751.00 752.00 0
1989-01-15 Cement Squeeze 751.00 752.00 0
1989-01-16 Perforation 695.00 696.00 13
1989-01-18 Cement Squeeze 695.00 696.00 0
1989-01-19 Perforation 270.00 271.00 13
1989-01-19 Remedial Casing Cementing 270.00 271.00 0
1953-05-27 Perforation 1079.00 1088.10 13
1953-05-28 Acid Treatment 1079.00 1088.10 0
1953-05-30 Cement Plug 1061.60 1072.30 0
1953-05-31 Perforation 1044.20 1048.50 13
1953-05-31 Acid Treatment 1044.20 1048.50 0
1953-06-18 Packing Device Capped w/Cement 1043.00 1043.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 261 0.0 0.0 0.0
1976 735 0.0 0.0 0.0
1977 384 0.0 0.0 0.0
1978 267 0.0 0.0 0.0
1980 828 0.0 0.0 0.0
1981 4276 0.0 0.0 0.0
1982 3051 0.0 0.0 0.0
1983 3613 0.0 0.0 0.0
1984 3330 0.0 0.0 0.0
1985 2102 0.0 0.0 0.0
1986 2330 0.0 0.0 0.0
1987 2049 0.0 0.0 0.0

For data sources see[5]

References