X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134143405020

Well Details

Well ID: 0134143405020
Loading map...
Location: 02/05-34-013-14W4/0
Location Alias: 02/05-34-13-14 W4M
Location Alias 2: 02/05-34-013-14 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 14
Section: 34
County/Municipality: Municipal District of Taber
Well Name: AMOCO HAYS 5-34-13-14
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0049366
License Date: 1974-03-14
License Status: RecCertified
Spud Date: 1975-10-18
Final Drill Date: 1975-10-25
Well Total Depth: 965.90 m
Surface Hole Latitude: 50.127249
Surface Hole Longitude: -111.844603

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-03-14 Obtained License
1975-10-25 Finished Drilling
1975-10-25 Well Mode changed to Drilled and Cased
1975-10-26 Production Casing Operation Performed
1978-01-15 Well Log Performed
1986-07-09 Perforation Treatment Performed - Jet Perforation
1986-07-11 Well Log Performed
1986-07-12 Perforation Treatment Performed - Jet Perforation
1989-06-15 Well Began Production
1989-06-15 Well Fluid changed to Crude Oil
1989-06-15 Well Mode changed to Flowing
1991-10-31 Well Fluid changed to Crude Oil
1991-10-31 Well Mode changed to Suspended
1993-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-04-17 Perforation Treatment Performed - Jet Perforation
1993-04-17 Plug Back Performed
1993-04-17 Well Log Performed
1993-04-18 Perforation Treatment Performed - Remedial Casing
1993-04-18 Well Fluid changed to Crude Oil
1993-04-18 Well Mode changed to Abandoned
1993-05-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-07-09 Perforation 955.00 956.00 13
1993-04-18 Remedial Casing Cementing 182.00 185.50 0
1986-07-09 Perforation 949.50 951.50 13
1986-07-12 Perforation 938.20 939.50 0
1993-04-17 Packing Device Capped w/Cement 922.00 930.00 0
1993-04-17 Perforation 251.50 252.00 13
1993-04-17 Packing Device Capped w/Cement 241.80 249.80 0
1993-04-17 Perforation 185.00 185.50 13
1993-04-17 Perforation 183.00 183.50 13
1993-04-17 Perforation 182.00 182.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1087 0.0 0.0 0.0

For data sources see[5]

References