X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134143405000

Well Details

Well ID: 0134143405000
Loading map...
Location: 00/05-34-013-14W4/0
Location Alias: 00/05-34-13-14 W4M
Location Alias 2: 00/05-34-013-14 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 14
Section: 34
County/Municipality: Municipal District of Taber
Well Name: AMOCO HAYS 5-34MN-13-14
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0042436
License Date: 1972-04-28
License Status: RecCertified
Spud Date: 1972-05-11
Final Drill Date: 1972-05-18
Well Total Depth: 964.10 m
Surface Hole Latitude: 50.125437
Surface Hole Longitude: -111.844547

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-04-28 Obtained License
1972-05-16 Production Casing Operation Performed
1972-05-18 Finished Drilling
1972-05-18 Well Mode changed to Drilled and Cased
1972-05-19 Well Began Production
1972-05-19 Well Fluid changed to Crude Oil
1972-05-19 Well Mode changed to Flowing
1976-03-17 Perforation Treatment Performed - Open-Hole Completion
1993-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-10 Perforation Treatment Performed - Jet Perforation
1993-08-10 Plug Back Performed
1993-08-12 Perforation Treatment Performed - Jet Perforation
1993-08-12 Well Log Performed
1993-08-13 Perforation Treatment Performed - Cement Plug
1993-08-13 Perforation Treatment Performed - Remedial Casing
1993-08-13 Well Fluid changed to Crude Oil
1993-08-13 Well Mode changed to Abandoned Zone
1994-01-10 Perforation Treatment Performed - Jet Perforation
1994-01-10 Perforation Treatment Performed - Remedial Casing
1994-12-19 Well Abandoned
1994-12-19 Well Fluid changed to Crude Oil
1994-12-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-17 Open Hole/Barefoot Completion 937.60 964.10 0
1993-08-10 Packing Device Capped w/Cement 925.00 933.00 0
1993-08-10 Perforation 249.50 250.00 14
1993-08-12 Perforation 135.00 136.00 14
1993-08-13 Remedial Casing Cementing 135.00 250.00 0
1993-08-13 Cement Plug 92.00 136.00 0
1994-01-10 Perforation 90.00 90.30 13
1994-01-10 Remedial Casing Cementing 90.00 90.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 4491 0.0 0.0 0.0
1973 8566 0.0 0.0 0.0
1974 7678 0.0 0.0 0.0
1975 6905 0.0 0.0 0.0
1976 6074 0.0 0.0 0.0
1977 7181 0.0 0.0 0.0
1978 7927 0.0 0.0 0.0
1979 8038 0.0 0.0 0.0
1980 8608 0.0 0.0 0.0
1981 8664 0.0 0.0 0.0
1982 8333 0.0 0.0 0.0
1983 8354 0.0 0.0 0.0
1984 8745 0.0 0.0 0.0
1985 8431 0.0 0.0 0.0
1986 8486 0.0 0.0 0.0
1987 8719 0.0 0.0 0.0
1988 4606 0.0 0.0 0.0

For data sources see[5]

References