X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134062616002

Well Details

Well ID: 0134062616002
Loading map...
Location: 00/16-26-013-06W4/2
Location Alias: 00/16-26-13-06 W4M
Location Alias 2: 00/16-26-013-06 W4/02
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 06
Section: 26
County/Municipality: Cypress County
Well Name: CITY OF MEDICINE HAT 16-26-13-6
Operator Name: City Of Medicine Hat
License Number: 0082618
License Date: 1980-05-06
License Status: Issued
Spud Date: 1980-05-09
Final Drill Date: 1980-05-10
Well Total Depth: 420.00 m
Surface Hole Latitude: 50.117400
Surface Hole Longitude: -110.710263

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-06 Obtained License
1980-05-09 Surface Casing Operation Performed
1980-05-10 Finished Drilling
1980-05-10 Production Casing Operation Performed
1980-05-10 Well Mode changed to Drilled and Cased
1980-05-15 Perforation Treatment Performed - Jet Perforation
1980-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-23 Perforation Treatment Performed - Fractured
1984-10-01 Well Began Production
1984-10-01 Well Fluid changed to Gas
1984-10-01 Well Mode changed to Flowing
1990-11-03 Perforation Treatment Performed - Jet Perforation
1990-11-16 Perforation Treatment Performed - Fractured
1990-11-27 Well Log Performed
1990-11-29 Perforation Treatment Performed - Jet Perforation
1990-12-01 Perforation Treatment Performed - Jet Perforation
1990-12-06 Perforation Treatment Performed - Fractured
1993-04-21 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-15 Perforation 334.00 338.50 6
1990-11-03 Perforation 379.80 381.00 6
1990-11-16 Fracture 334.00 381.00 0
1990-11-29 Perforation 258.70 259.50 6
1990-11-29 Perforation 266.30 266.70 6
1990-11-29 Perforation 274.20 274.70 6
1990-11-29 Perforation 278.00 279.30 6
1990-11-29 Perforation 285.40 285.90 6
1990-11-29 Perforation 286.80 287.40 6
1990-11-29 Perforation 290.50 290.90 6
1990-11-29 Perforation 291.50 292.00 6
1980-05-15 Perforation 349.00 351.00 6
1990-11-29 Perforation 292.50 293.00 6
1990-11-29 Perforation 295.20 295.60 6
1990-11-29 Perforation 295.90 296.40 6
1990-12-01 Perforation 243.00 243.70 3
1990-12-01 Perforation 247.30 247.80 6
1990-12-01 Perforation 248.30 248.70 6
1990-12-01 Perforation 251.80 252.30 6
1990-12-01 Perforation 254.50 255.20 6
1990-12-01 Perforation 255.50 256.30 6
1990-12-06 Fracture 243.00 296.40 0
1980-05-15 Perforation 374.00 376.00 6
1980-05-15 Perforation 378.50 379.70 6
1980-05-21 Acid Treatment 334.00 379.70 0
1980-05-23 Fracture 334.00 379.70 0
1990-11-03 Perforation 351.50 352.00 6
1990-11-03 Perforation 354.60 355.40 6
1990-11-03 Perforation 376.00 376.50 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2208 0.0 0.0 0.0
1985 7812 0.0 0.0 0.0
1986 8605 0.0 0.0 0.0
1987 8609 0.0 0.0 0.0
1988 8395 0.0 0.0 0.0
1989 8442 0.0 0.0 0.0
1990 7265 0.0 0.0 0.0
1991 2136 0.0 0.0 0.0
1993 1848 0.0 0.0 0.0

For data sources see[5]

References