X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134062106000

Well Details

Well ID: 0134062106000
Loading map...
Location: 00/06-21-013-06W4/0
Location Alias: 00/06-21-13-06 W4M
Location Alias 2: 00/06-21-013-06 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 06
Section: 21
County/Municipality: Redcliff
Well Name: CITY OF MEDICINE HAT 6-21-13-6
Operator Name: City Of Medicine Hat
License Number: B0001039
License Date: 1945-08-02
License Status: Issued
Spud Date: 1945-09-07
Final Drill Date: 1945-12-11
Well Total Depth: 400.80 m
Surface Hole Latitude: 50.098634
Surface Hole Longitude: -110.766868

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1945-08-02 Obtained License
1945-12-04 Liner Casing Operation Performed
1945-12-06 Perforation Treatment Performed - Bullet Perforation
1945-12-08 Perforation Treatment Performed - Cement Squeeze
1945-12-11 Finished Drilling
1945-12-11 Perforation Treatment Performed - Open-Hole Completion
1945-12-11 Well Mode changed to Drilled and Cased
1945-12-12 Perforation Treatment Performed - Bullet Perforation
1945-12-15 Well Began Production
1945-12-15 Well Fluid changed to Gas
1945-12-15 Well Mode changed to Flowing
1972-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-09-01 Perforation Treatment Performed - Jet Perforation
1972-09-26 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1945-12-06 Bullet Perforation 353.90 356.00 3
1945-12-08 Cement Squeeze 353.90 356.00 0
1945-12-11 Open Hole/Barefoot Completion 363.00 376.70 0
1945-12-12 Bullet Perforation 363.30 372.50 7
1972-09-01 Perforation 365.20 371.90 13
1972-09-01 Acid Treatment 365.20 371.90 0
1972-09-26 Fracture 365.20 371.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8015 0.0 0.0 0.0
1970 8735 0.0 0.0 0.0
1971 8494 0.0 0.0 0.0
1972 3504 0.0 0.0 0.0
1973 7799 0.0 0.0 0.0
1974 8567 0.0 0.0 0.0
1975 8735 0.0 0.0 0.0
1976 8759 0.0 0.0 0.0
1977 8759 0.0 0.0 0.0
1978 8591 0.0 0.0 0.0
1979 7968 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 8413 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 6470 0.0 0.0 0.0
1984 7560 0.0 0.0 0.0
1985 7290 0.0 0.0 0.0
1986 7260 0.0 0.0 0.0
1987 6742 0.0 0.0 0.0
1988 6620 0.0 0.0 0.0
1989 7649 0.0 0.0 0.0
1991 720 0.0 0.0 0.0
1992 4416 0.0 0.0 0.0
1993 8433 0.0 0.0 0.0
1994 8111 0.0 0.0 0.0
1995 3199 0.0 0.0 0.0
1996 2890 0.0 0.0 0.0
2004 2829 0.0 0.0 0.0
2005 7986 0.0 0.0 0.0
2006 8505 0.0 0.0 0.0
2007 8727 0.0 0.0 0.0
2008 8707 0.0 0.0 0.0
2009 8713 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8471 0.0 0.0 0.0
2013 7769 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8493 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8754 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 6216 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References