If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134061414002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.090353,"lon":-110.722799,"icon":""}]} |
Location: 00/14-14-013-06W4/2 | |
Location Alias: 00/14-14-13-06 W4M | |
Location Alias 2: 00/14-14-013-06 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 06 | |
Section: 14 | |
County/Municipality: Medicine Hat | |
Well Name: CITY OF MEDICINE HAT 14-14-13-6 | |
Operator Name: City Of Medicine Hat | |
License Number: 0071706 | |
License Date: 1978-08-31 | |
License Status: Suspension | |
Spud Date: 1978-09-23 | |
Final Drill Date: 1978-09-24 | |
Well Total Depth: 592.00 m | |
Surface Hole Latitude: 50.090353 | |
Surface Hole Longitude: -110.722799 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-08-31 | Obtained License |
1978-09-24 | Finished Drilling |
1978-09-24 | Well Mode changed to Drilled and Cased |
1978-09-25 | Production Casing Operation Performed |
1978-10-15 | Perforation Treatment Performed - Bullet Perforation |
1978-10-15 | Perforation Treatment Performed - Selective Bullet Perforations |
1978-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-10-24 | Perforation Treatment Performed - Fractured |
1978-11-02 | Perforation Treatment Performed - Selective Bullet Perforations |
1978-11-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-11-09 | Perforation Treatment Performed - Fractured |
1979-08-09 | Well Began Production |
1979-08-09 | Well Fluid changed to Gas |
1979-08-09 | Well Mode changed to Flowing |
1996-10-21 | Well Log Performed |
1996-10-24 | Perforation Treatment Performed - Fractured |
1996-10-24 | Perforation Treatment Performed - Jet Perforation |
1996-11-27 | Perforation Treatment Performed - Jet Perforation |
1996-11-29 | Perforation Treatment Performed - Fractured |
1996-12-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-10-15 | Bullet Perforation | 535.30 | 538.00 | 4 |
1978-11-02 | Selective Bullet Perforations | 360.50 | 361.00 | 0 |
1978-11-02 | Selective Bullet Perforations | 361.50 | 362.00 | 0 |
1978-11-02 | Selective Bullet Perforations | 362.50 | 363.00 | 0 |
1978-11-02 | Selective Bullet Perforations | 365.00 | 365.50 | 0 |
1978-11-02 | Selective Bullet Perforations | 366.00 | 366.50 | 0 |
1978-11-02 | Selective Bullet Perforations | 367.00 | 367.50 | 0 |
1978-11-02 | Selective Bullet Perforations | 368.00 | 386.50 | 0 |
1978-11-02 | Selective Bullet Perforations | 387.00 | 387.50 | 0 |
1978-11-02 | Selective Bullet Perforations | 388.00 | 390.70 | 0 |
1978-11-02 | Selective Bullet Perforations | 391.00 | 391.70 | 0 |
1978-10-15 | Bullet Perforation | 539.00 | 540.70 | 4 |
1978-11-02 | Selective Bullet Perforations | 392.00 | 393.40 | 0 |
1978-11-02 | Selective Bullet Perforations | 393.70 | 394.00 | 0 |
1978-11-08 | Acid Treatment | 360.50 | 394.00 | 0 |
1978-11-09 | Fracture | 360.50 | 394.00 | 0 |
1996-10-24 | Perforation | 344.00 | 352.00 | 7 |
1996-10-24 | Fracture | 344.00 | 352.00 | 0 |
1996-11-27 | Perforation | 253.00 | 255.00 | 7 |
1996-11-27 | Perforation | 265.40 | 267.50 | 7 |
1996-11-29 | Fracture | 253.00 | 267.50 | 0 |
1978-10-15 | Bullet Perforation | 543.20 | 544.00 | 4 |
1978-10-15 | Selective Bullet Perforations | 548.30 | 548.40 | 0 |
1978-10-15 | Selective Bullet Perforations | 554.20 | 568.80 | 0 |
1978-10-15 | Selective Bullet Perforations | 570.90 | 572.40 | 0 |
1978-10-15 | Selective Bullet Perforations | 576.40 | 577.30 | 0 |
1978-10-23 | Acid Treatment | 535.30 | 577.30 | 0 |
1978-10-24 | Fracture | 535.30 | 577.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 3888 | 0.0 | 0.0 | 0.0 |
1980 | 8783 | 0.0 | 0.0 | 0.0 |
1981 | 8759 | 0.0 | 0.0 | 0.0 |
1982 | 8759 | 0.0 | 0.0 | 0.0 |
1983 | 7607 | 0.0 | 0.0 | 0.0 |
1984 | 8759 | 0.0 | 0.0 | 0.0 |
1985 | 8663 | 0.0 | 0.0 | 0.0 |
1986 | 8735 | 0.0 | 0.0 | 0.0 |
1987 | 3192 | 0.0 | 0.0 | 0.0 |
1988 | 3840 | 0.0 | 0.0 | 0.0 |
1989 | 8135 | 0.0 | 0.0 | 0.0 |
1990 | 6192 | 0.0 | 0.0 | 0.0 |
1991 | 8759 | 0.0 | 0.0 | 0.0 |
1992 | 8140 | 0.0 | 0.0 | 0.0 |
1993 | 2496 | 0.0 | 0.0 | 0.0 |
1994 | 8476 | 0.0 | 0.0 | 0.0 |
1995 | 7272 | 0.0 | 0.0 | 0.0 |
1996 | 7848 | 0.0 | 0.0 | 0.0 |
For data sources see[5]