X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134042306020

Well Details

Well ID: 0134042306020
Loading map...
Location: 02/06-23-013-04W4/0
Location Alias: 02/06-23-13-04 W4M
Location Alias 2: 02/06-23-013-04 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 04
Section: 23
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 6-23-13-4
Operator Name: Pine Cliff Energy Ltd.
License Number: 0063941
License Date: 1977-05-24
License Status: Issued
Spud Date: 1977-06-10
Final Drill Date: 1977-06-12
Well Total Depth: 648.90 m
Surface Hole Latitude: 50.095339
Surface Hole Longitude: -110.452602

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-24 Obtained License
1977-06-12 Finished Drilling
1977-06-12 Production Casing Operation Performed
1977-07-26 Perforation Treatment Performed - Selective Bullet Perforations
1977-08-03 Perforation Treatment Performed - Fractured
1977-10-10 Perforation Treatment Performed - Selective Bullet Perforations
1977-11-02 Perforation Treatment Performed - Fractured
1977-11-08 Perforation Treatment Performed - Selective Bullet Perforations
1977-11-11 Perforation Treatment Performed - Fractured
1978-02-03 Well Mode changed to Drilled and Cased
1978-11-04 Well Began Production
1978-11-04 Well Fluid changed to Gas
1978-11-04 Well Mode changed to Flowing
1984-03-20 Well Fluid changed to Gas
1984-03-20 Well Mode changed to Suspended
1984-09-26 Well Fluid changed to Gas
1984-09-26 Well Mode changed to Flowing
1987-01-06 Well Fluid changed to Gas
1987-01-06 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-07-26 Selective Bullet Perforations 580.60 581.30 0
1977-07-26 Selective Bullet Perforations 610.80 610.80 0
1977-08-03 Fracture 580.60 610.80 0
1977-10-10 Selective Bullet Perforations 442.00 442.60 0
1977-10-10 Selective Bullet Perforations 443.20 443.80 0
1977-10-10 Selective Bullet Perforations 444.40 445.00 0
1977-10-10 Selective Bullet Perforations 445.60 446.20 0
1977-10-10 Selective Bullet Perforations 448.10 448.70 0
1977-10-10 Selective Bullet Perforations 449.30 449.90 0
1977-10-10 Selective Bullet Perforations 450.50 451.10 0
1977-10-10 Selective Bullet Perforations 451.70 452.30 0
1977-07-26 Selective Bullet Perforations 583.40 584.00 0
1977-10-10 Selective Bullet Perforations 452.90 454.80 0
1977-10-10 Selective Bullet Perforations 459.30 462.70 0
1977-10-10 Selective Bullet Perforations 481.30 490.10 0
1977-11-02 Fracture 442.00 490.10 0
1977-11-08 Selective Bullet Perforations 418.20 418.80 0
1977-11-08 Selective Bullet Perforations 419.40 420.00 0
1977-11-08 Selective Bullet Perforations 420.60 421.20 0
1977-11-08 Selective Bullet Perforations 421.80 422.50 0
1977-11-08 Selective Bullet Perforations 423.10 423.70 0
1977-11-08 Selective Bullet Perforations 424.30 426.70 0
1977-07-26 Selective Bullet Perforations 584.60 585.20 0
1977-11-08 Selective Bullet Perforations 427.90 431.00 0
1977-11-08 Selective Bullet Perforations 433.40 438.60 0
1977-11-11 Fracture 418.20 438.60 0
1977-07-26 Selective Bullet Perforations 585.80 586.40 0
1977-07-26 Selective Bullet Perforations 587.00 588.30 0
1977-07-26 Selective Bullet Perforations 589.50 590.70 0
1977-07-26 Selective Bullet Perforations 591.90 593.10 0
1977-07-26 Selective Bullet Perforations 594.40 599.20 0
1977-07-26 Selective Bullet Perforations 602.30 607.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1390 0.0 0.0 0.0
1979 7018 0.0 0.0 0.0
1980 7109 0.0 0.0 0.0
1981 1492 0.0 0.0 0.0
1982 720 0.0 0.0 0.0
1984 2543 0.0 0.0 0.0
1985 6455 0.0 0.0 0.0
1986 5630 0.0 0.0 0.0
1987 7290 0.0 0.0 0.0
1988 8739 0.0 0.0 0.0
1989 7993 0.0 0.0 0.0
1990 8730 0.0 0.0 0.0
1991 8452 0.0 0.0 0.0
1992 8769 0.0 0.0 0.0
1993 8715 0.0 0.0 0.0
1994 8751 0.0 0.0 0.0
1995 8730 0.0 0.0 0.0
1996 8748 0.0 0.0 0.0
1997 8692 0.0 0.0 0.0
1998 8742 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8663 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References