If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134032806022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.109947,"lon":-110.35826,"icon":""}]} |
Location: 02/06-28-013-03W4/2 | |
Location Alias: 02/06-28-13-03 W4M | |
Location Alias 2: 02/06-28-013-03 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 28 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 6-28-13-3 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0054134 | |
License Date: 1975-07-04 | |
License Status: Abandoned | |
Spud Date: 1975-08-02 | |
Final Drill Date: 1975-08-08 | |
Well Total Depth: 647.70 m | |
Surface Hole Latitude: 50.109947 | |
Surface Hole Longitude: -110.358260 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-07-04 | Obtained License |
1975-08-08 | Finished Drilling |
1975-08-08 | Well Mode changed to Drilled and Cased |
1975-08-11 | Production Casing Operation Performed |
1975-09-19 | Perforation Treatment Performed - Selective Bullet Perforations |
1975-10-21 | Perforation Treatment Performed - Selective Bullet Perforations |
1976-04-14 | Perforation Treatment Performed - Fractured |
1976-04-18 | Well Began Production |
1976-04-18 | Well Fluid changed to Gas |
1976-04-18 | Well Mode changed to Flowing |
1976-05-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-09-22 | Perforation Treatment Performed - Jet Perforation |
1976-09-27 | Perforation Treatment Performed - Fractured |
1990-03-01 | Well Fluid changed to Gas |
1990-03-01 | Well Mode changed to Suspended |
1992-06-01 | Well Fluid changed to Gas |
1992-06-01 | Well Mode changed to Flowing |
1998-04-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-04-21 | Plug Back Performed |
1998-04-21 | Well Fluid changed to Gas |
1998-04-21 | Well Mode changed to Abandoned Zone |
1998-06-16 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-09-19 | Selective Bullet Perforations | 447.80 | 448.70 | 0 |
1975-10-21 | Selective Bullet Perforations | 546.50 | 548.00 | 0 |
1975-10-21 | Selective Bullet Perforations | 550.80 | 558.40 | 0 |
1975-10-21 | Selective Bullet Perforations | 559.00 | 562.40 | 0 |
1975-10-21 | Selective Bullet Perforations | 563.00 | 605.30 | 0 |
1975-10-21 | Selective Bullet Perforations | 606.20 | 607.20 | 0 |
1975-10-21 | Selective Bullet Perforations | 610.20 | 611.10 | 0 |
1975-10-21 | Selective Bullet Perforations | 612.00 | 613.00 | 0 |
1975-10-21 | Selective Bullet Perforations | 616.60 | 617.20 | 0 |
1975-10-21 | Selective Bullet Perforations | 619.40 | 620.00 | 0 |
1976-04-14 | Fracture | 447.80 | 563.00 | 0 |
1975-09-19 | Selective Bullet Perforations | 449.60 | 450.50 | 0 |
1976-05-05 | Packing Device Capped w/Cement | 592.80 | 600.50 | 0 |
1976-09-22 | Perforation | 337.10 | 337.70 | 3 |
1976-09-22 | Perforation | 348.70 | 349.30 | 3 |
1976-09-22 | Perforation | 382.20 | 383.10 | 3 |
1976-09-22 | Perforation | 384.00 | 384.70 | 3 |
1976-09-27 | Fracture | 337.10 | 384.70 | 0 |
1998-04-21 | Packing Device Capped w/Cement | 319.00 | 327.00 | 0 |
1975-09-19 | Selective Bullet Perforations | 451.40 | 451.40 | 0 |
1975-10-21 | Selective Bullet Perforations | 453.80 | 454.80 | 0 |
1975-10-21 | Selective Bullet Perforations | 459.90 | 460.90 | 0 |
1975-10-21 | Selective Bullet Perforations | 473.00 | 474.00 | 0 |
1975-10-21 | Selective Bullet Perforations | 475.20 | 509.60 | 0 |
1975-10-21 | Selective Bullet Perforations | 527.90 | 528.50 | 0 |
1975-10-21 | Selective Bullet Perforations | 539.20 | 539.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 5403 | 0.0 | 0.0 | 0.0 |
1977 | 8651 | 0.0 | 0.0 | 0.0 |
1978 | 6717 | 0.0 | 0.0 | 0.0 |
1979 | 6486 | 0.0 | 0.0 | 0.0 |
1980 | 5876 | 0.0 | 0.0 | 0.0 |
1981 | 6333 | 0.0 | 0.0 | 0.0 |
1982 | 8736 | 0.0 | 0.0 | 0.0 |
1983 | 5360 | 0.0 | 0.0 | 0.0 |
1984 | 7170 | 0.0 | 0.0 | 0.0 |
1985 | 8294 | 0.0 | 0.0 | 0.0 |
1986 | 6367 | 0.0 | 0.0 | 0.0 |
1987 | 8081 | 0.0 | 0.0 | 0.0 |
1988 | 8243 | 0.0 | 0.0 | 0.0 |
1989 | 8192 | 0.0 | 0.0 | 0.0 |
1990 | 870 | 0.0 | 0.0 | 0.0 |
1992 | 2247 | 0.0 | 0.0 | 0.0 |
1993 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]