X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134030906000

Well Details

Well ID: 0134030906000
Loading map...
Location: 00/06-09-013-03W4/0
Location Alias: 00/06-09-13-03 W4M
Location Alias 2: 00/06-09-013-03 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 03
Section: 09
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 6-9-13-3
Operator Name: Pine Cliff Energy Ltd.
License Number: 0075198
License Date: 1979-04-10
License Status: Issued
Spud Date: 1979-07-02
Final Drill Date: 1979-07-04
Well Total Depth: 505.00 m
Surface Hole Latitude: 50.066568
Surface Hole Longitude: -110.362706

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-10 Obtained License
1979-07-04 Finished Drilling
1979-07-04 Production Casing Operation Performed
1979-07-04 Well Mode changed to Drilled and Cased
1979-07-20 Perforation Treatment Performed - Jet Perforation
1979-07-22 Perforation Treatment Performed - Fractured
1979-07-28 Perforation Treatment Performed - Jet Perforation
1979-07-29 Perforation Treatment Performed - Fractured
1979-09-13 Well Began Production
1979-09-13 Well Fluid changed to Gas
1979-09-13 Well Mode changed to Flowing
1980-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-28 Perforation Treatment Performed - Bridge Plug No Cement Required
1986-03-28 Perforation Treatment Performed - Jet Perforation
1986-03-28 Well Fluid changed to Gas
1986-03-28 Well Log Performed
1986-03-28 Well Mode changed to Abandoned Zone
1986-03-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-20 Perforation 462.00 465.00 7
1979-07-22 Fracture 462.00 465.00 0
1979-07-28 Perforation 436.50 439.50 5
1979-07-29 Fracture 436.50 439.50 0
1980-03-28 Packing Device Capped w/Cement 448.00 450.00 0
1986-03-28 Bridge Plug, No Cement 435.00 435.00 0
1986-03-28 Perforation 423.00 427.50 7
1986-03-29 Fracture 423.00 427.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2062 0.0 0.0 0.0
1980 7732 0.0 0.0 0.0
1981 7624 0.0 0.0 0.0
1982 5618 0.0 0.0 0.0
1983 8701 0.0 0.0 0.0
1984 7775 0.0 0.0 0.0
1985 7985 0.0 0.0 0.0
1986 1909 0.0 0.0 0.0

For data sources see[5]

References