X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134013204000

Well Details

Well ID: 0134013204000
Loading map...
Location: 00/04-32-013-01W4/0
Location Alias: 00/04-32-13-01 W4M
Location Alias 2: 00/04-32-013-01 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 01
Section: 32
County/Municipality: Cypress County
Well Name: PINE CLIFF MEDHAT 4-32-13-1
Operator Name: Pine Cliff Energy Ltd.
License Number: 0049687
License Date: 1974-05-08
License Status: Suspension
Spud Date: 1974-08-08
Final Drill Date: 1974-08-09
Well Total Depth: 405.70 m
Surface Hole Latitude: 50.123618
Surface Hole Longitude: -110.113322

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-05-08 Obtained License
1974-08-09 Finished Drilling
1974-08-09 Production Casing Operation Performed
1974-08-09 Well Mode changed to Drilled and Cased
1974-10-03 Perforation Treatment Performed - Selective Jet Perforations
1974-10-05 Perforation Treatment Performed - Fractured
1975-01-31 Well Began Production
1975-01-31 Well Fluid changed to Gas
1975-01-31 Well Mode changed to Flowing
2005-05-12 Perforation Treatment Performed - Jet Perforation
2005-05-25 Perforation Treatment Performed - Fractured
2012-07-01 Well Fluid changed to Gas
2012-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-10-03 Selective Jet Perforations 335.90 336.50 0
1974-10-03 Selective Jet Perforations 370.00 370.00 0
1974-10-05 Fracture 335.90 370.00 0
2005-05-12 Perforation 380.00 382.00 7
2005-05-12 Perforation 368.60 370.60 7
2005-05-12 Perforation 355.00 357.00 7
2005-05-12 Perforation 339.00 341.00 7
2005-05-12 Perforation 326.00 328.00 7
2005-05-12 Perforation 308.00 310.00 7
2005-05-12 Perforation 292.00 294.00 7
2005-05-25 Fracture 380.00 382.00 0
1974-10-03 Selective Jet Perforations 337.10 337.70 0
2005-05-25 Fracture 363.60 370.60 0
2005-05-25 Fracture 354.80 357.00 0
2005-05-25 Fracture 335.90 341.00 0
2005-05-25 Fracture 326.00 328.00 0
2005-05-25 Fracture 308.00 310.00 0
2005-05-25 Fracture 292.00 294.00 0
1974-10-03 Selective Jet Perforations 338.30 339.20 0
1974-10-03 Selective Jet Perforations 354.80 355.70 0
1974-10-03 Selective Jet Perforations 356.30 356.90 0
1974-10-03 Selective Jet Perforations 363.60 364.20 0
1974-10-03 Selective Jet Perforations 365.80 366.40 0
1974-10-03 Selective Jet Perforations 367.00 367.60 0
1974-10-03 Selective Jet Perforations 368.20 369.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 7889 0.0 0.0 0.0
1976 8782 0.0 0.0 0.0
1977 8303 0.0 0.0 0.0
1978 7847 0.0 0.0 0.0
1979 7671 0.0 0.0 0.0
1980 7856 0.0 0.0 0.0
1981 6362 0.0 0.0 0.0
1982 4735 0.0 0.0 0.0
1983 3203 0.0 0.0 0.0
1984 2436 0.0 0.0 0.0
1985 6973 0.0 0.0 0.0
1986 5828 0.0 0.0 0.0
1987 6815 0.0 0.0 0.0
1988 8251 0.0 0.0 0.0
1989 7826 0.0 0.0 0.0
1990 5659 0.0 0.0 0.0
1991 6881 0.0 0.0 0.0
1992 6126 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8735 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 1896 0.0 0.0 0.0

For data sources see[5]

References