X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124280808000

Well Details

Well ID: 0124280808000
Loading map...
Location: 00/08-08-012-28W4/0
Location Alias: 00/08-08-12-28 W4M
Location Alias 2: 00/08-08-012-28 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 28
Section: 08
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: DOME ET AL LYNDON 8-8-12-28
Operator Name: BP Canada Energy Group ULC
License Number: 0083504
License Date: 1980-06-16
License Status: RecCertified
Spud Date: 1980-06-24
Final Drill Date: 1980-08-04
Well Total Depth: 2982.00 m
Surface Hole Latitude: 49.982493
Surface Hole Longitude: -113.782835

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-16 Obtained License
1980-08-04 Finished Drilling
1980-08-09 Production Casing Operation Performed
1980-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-17 Perforation Treatment Performed - Jet Perforation
1980-09-19 Perforation Treatment Performed - Fractured
1980-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-04 Perforation Treatment Performed - Jet Perforation
1980-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-08 Perforation Treatment Performed - Jet Perforation
1980-10-16 Perforation Treatment Performed - Jet Perforation
1980-12-04 Well Abandoned
1980-12-04 Well Mode changed to Abandoned
1982-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-17 Perforation 2842.00 2850.00 7
1982-12-04 Packing Device Capped w/Cement 2417.00 2426.00 0
1980-09-17 Acid Treatment 2842.00 2850.00 0
1980-09-19 Fracture 2842.00 2850.00 0
1980-10-04 Packing Device Capped w/Cement 2840.00 2840.00 0
1980-10-04 Perforation 2478.00 2490.00 7
1980-10-08 Packing Device Capped w/Cement 2476.00 2476.00 0
1980-10-08 Perforation 2458.00 2464.00 7
1980-10-16 Perforation 2439.00 2449.00 7
1980-10-16 Perforation 2450.00 2456.00 7

For data sources see[4]



References