X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124263611000

Well Details

Well ID: 0124263611000
Loading map...
Location: 00/11-36-012-26W4/0
Location Alias: 00/11-36-12-26 W4M
Location Alias 2: 00/11-36-012-26 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 26
Section: 36
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: CRESTAR ET AL CLARESHOLM 11-36-12-26
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0043731
License Date: 1972-03-10
License Status: RecCertified
Spud Date: 1972-10-04
Final Drill Date: 1972-10-22
Well Total Depth: 2110.70 m
Surface Hole Latitude: 50.044049
Surface Hole Longitude: -113.428721

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-03-10 Obtained License
1972-10-21 Drill Stem Test Performed
1972-10-22 Finished Drilling
1972-10-23 Drill Stem Test Performed
1972-10-25 Production Casing Operation Performed
1972-11-04 Perforation Treatment Performed - Jet Perforation
1972-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-09 Perforation Treatment Performed - Cement Squeeze
1972-11-10 Perforation Treatment Performed - Jet Perforation
1972-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-02 Well Mode changed to Drilled and Cased
1974-06-28 Perforation Treatment Performed - Cement Squeeze
1974-06-29 Perforation Treatment Performed - Jet Perforation
1974-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-01 Well Began Injection
1974-07-01 Well Fluid changed to Water
1974-07-01 Well Type changed to Disposal
1994-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-07 Plug Back Performed
2005-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-08 Perforation Treatment Performed - Jet Perforation
2005-01-08 Plug Back Performed
2005-01-08 Well Fluid changed to Water
2005-01-08 Well Log Performed
2005-01-08 Well Mode changed to Abandoned Zone
2005-01-08 Well Type changed to Disposal
2005-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-10 Perforation Treatment Performed - Remedial Casing
2005-01-11 Perforation Treatment Performed - Jet Perforation
2005-01-11 Well Log Performed
2005-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-15 Perforation Treatment Performed - Remedial Casing
2005-01-17 Perforation Treatment Performed - Jet Perforation
2005-01-17 Well Log Performed
2005-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-19 Perforation Treatment Performed - Remedial Casing
2005-01-21 Perforation Treatment Performed - Jet Perforation
2005-01-21 Well Log Performed
2005-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-22 Perforation Treatment Performed - Remedial Casing
2005-02-18 Well Abandoned
2005-02-18 Well Fluid changed to Water
2005-02-18 Well Mode changed to Abandoned
2005-02-18 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-11-04 Perforation 2078.10 2079.70 7
1994-10-16 Acid Treatment 2096.70 2102.50 0
2005-01-07 Packing Device Capped w/Cement 2076.00 2084.00 0
2005-01-08 Packing Device Capped w/Cement 2062.00 2070.00 0
2005-01-08 Perforation 1775.00 1775.50 7
2005-01-10 Remedial Casing Cementing 1775.00 1775.50 0
2005-01-10 Packing Device Capped w/Cement 1762.50 1770.50 0
2005-01-11 Perforation 1195.00 1195.50 17
2005-01-15 Remedial Casing Cementing 1195.00 1195.50 0
2005-01-15 Packing Device Capped w/Cement 1185.40 1193.40 0
2005-01-17 Perforation 1095.00 1095.50 7
1972-11-09 Acid Treatment 2078.10 2079.70 0
2005-01-19 Remedial Casing Cementing 1095.00 1095.50 0
2005-01-19 Packing Device Capped w/Cement 1083.00 1091.00 0
2005-01-21 Perforation 475.00 475.50 7
2005-01-22 Remedial Casing Cementing 475.00 475.50 0
2005-01-22 Packing Device Capped w/Cement 464.00 472.00 0
1972-11-09 Cement Squeeze 2078.10 2079.70 0
1972-11-10 Perforation 2075.10 2075.70 7
1972-11-10 Perforation 2076.30 2077.50 7
1972-11-12 Acid Treatment 2075.10 2077.50 0
1974-06-28 Cement Squeeze 2075.10 2077.50 0
1974-06-29 Perforation 2096.70 2102.50 7
1974-06-30 Acid Treatment 2096.70 2102.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References