If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0124253006000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/06-30-012-25W4/0 | |
| Location Alias: 00/06-30-12-25 W4M | |
| Location Alias 2: 00/06-30-012-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 012 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 30 | |
| County/Municipality: Municipal District of Willow Creek No. 26 | |
| Well Name: CRESTAR 100 CLARESHOLM 6-30-12-25 | |
| Operator Name: ConocoPhillips Canada Resources Corp. | |
| License Number: 0042323 | |
| License Date: 1972-03-13 | |
| License Status: RecCertified | |
| Spud Date: 1972-03-16 | |
| Final Drill Date: 1972-04-09 | |
| Well Total Depth: 2170.20 m | |
| Surface Hole Latitude: 50.023398 | |
| Surface Hole Longitude: -113.406765 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1972-03-13 | Obtained License |
| 1972-04-04 | Drill Stem Test Performed |
| 1972-04-06 | Drill Stem Test Performed |
| 1972-04-07 | Drill Stem Test Performed |
| 1972-04-09 | Finished Drilling |
| 1972-04-11 | Drill Stem Test Performed |
| 1972-04-12 | Production Casing Operation Performed |
| 1972-04-13 | Well Mode changed to Drilled and Cased |
| 1972-12-07 | Perforation Treatment Performed - Jet Perforation |
| 1972-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1972-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1974-12-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-12-29 | Perforation Treatment Performed - Jet Perforation |
| 1984-03-04 | Well Began Production |
| 1984-03-04 | Well Fluid changed to Gas |
| 1984-03-04 | Well Mode changed to Flowing |
| 1986-02-28 | Well Fluid changed to Gas |
| 1986-02-28 | Well Mode changed to Suspended |
| 1994-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-09-22 | Plug Back Performed |
| 1994-09-22 | Well Fluid changed to Gas |
| 1994-09-22 | Well Mode changed to Abandoned Zone |
| 2000-06-05 | Perforation Treatment Performed - Cement Plug |
| 2000-06-06 | Perforation Treatment Performed - Cement Plug |
| 2000-06-06 | Perforation Treatment Performed - Jet Perforation |
| 2000-06-06 | Well Log Performed |
| 2000-06-07 | Well Abandoned |
| 2000-06-07 | Well Fluid changed to Gas |
| 2000-06-07 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1972-12-07 | Perforation | 2059.20 | 2062.30 | 7 |
| 2000-06-06 | Cement Plug | 80.00 | 374.00 | 0 |
| 1972-12-09 | Acid Treatment | 2059.20 | 2062.30 | 0 |
| 1972-12-11 | Acid Treatment | 2059.20 | 2062.30 | 0 |
| 1974-12-18 | Packing Device Capped w/Cement | 2055.00 | 2055.00 | 0 |
| 1974-12-29 | Perforation | 2043.70 | 2051.90 | 7 |
| 1974-12-29 | Acid Treatment | 2043.70 | 2051.90 | 0 |
| 1994-09-22 | Packing Device Capped w/Cement | 2022.00 | 2030.00 | 0 |
| 2000-06-05 | Cement Plug | 1600.00 | 1653.00 | 0 |
| 2000-06-06 | Perforation | 373.00 | 374.00 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1975 | 250 | 0.0 | 0.0 | 0.0 |
| 1984 | 4104 | 0.0 | 0.0 | 0.0 |
| 1985 | 7868 | 0.0 | 0.0 | 0.0 |
| 1986 | 852 | 0.0 | 0.0 | 0.0 |
For data sources see[5]