X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124212012000

Well Details

Well ID: 0124212012000
Loading map...
Location: 00/12-20-012-21W4/0
Location Alias: 00/12-20-12-21 W4M
Location Alias 2: 00/12-20-012-21 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 21
Section: 20
County/Municipality: Lethbridge County
Well Name: ELAN ETAL KEHO 12-20-12-21
Operator Name: Bellatrix Exploration Ltd.
License Number: 0159288
License Date: 1993-06-18
License Status: Abandoned
Spud Date: 1994-02-24
Final Drill Date: 1994-03-06
Well Total Depth: 1383.00 m
Surface Hole Latitude: 50.014471
Surface Hole Longitude: -112.843230

For data sources see[1][2]

Well History

Date Event
1993-06-18 Obtained License
1994-02-25 Surface Casing Operation Performed
1994-03-04 Well Log Performed
1994-03-05 Drill Stem Test Performed
1994-03-06 Finished Drilling
1994-03-06 Well Mode changed to Drilled and Cased
1994-03-07 Production Casing Operation Performed
1994-03-07 Rig Released
1994-03-22 Well Log Performed
1994-03-24 Perforation Treatment Performed - Jet Perforation
1994-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-28 Well Log Performed
1994-03-29 Perforation Treatment Performed - Cement Squeeze
1994-03-30 Well Log Performed
1994-03-31 Perforation Treatment Performed - Jet Perforation
1994-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-06 Well Began Production
1994-04-06 Well Fluid changed to Crude Oil
1994-04-06 Well Mode changed to Pumping
1994-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-11 Plug Back Performed
1994-05-11 Well Fluid changed to Crude Oil
1994-05-11 Well Log Performed
1994-05-11 Well Mode changed to Abandoned Zone
1994-05-12 Perforation Treatment Performed - Jet Perforation
1994-05-12 Well Log Performed
2002-10-19 Well Log Performed
2002-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-20 Plug Back Performed
2002-10-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-24 Perforation 1356.00 1359.50 13
2002-10-20 Packing Device Capped w/Cement 1317.00 1325.00 0
1994-03-24 Perforation 1363.00 1365.00 13
1994-03-25 Acid Treatment 1363.00 1365.00 0
1994-03-26 Acid Treatment 1356.00 1359.50 0
1994-03-29 Cement Squeeze 1363.00 1365.00 0
1994-03-31 Perforation 1356.00 1359.50 18
1994-04-01 Acid Treatment 1356.00 1359.00 0
1994-05-11 Packing Device Capped w/Cement 1342.00 1350.00 0
1994-05-12 Perforation 1336.00 1337.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 282 0.0 0.0 0.0

For data sources see[5]

References