If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124210113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.966808,"lon":-112.73541,"icon":""}]} |
Location: 00/13-01-012-21W4/0 | |
Location Alias: 00/13-01-12-21 W4M | |
Location Alias 2: 00/13-01-012-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 21 | |
Section: 01 | |
County/Municipality: Lethbridge County | |
Well Name: SIGNALTA KEHO 13-1-12-21 | |
Operator Name: Signalta Resources Limited | |
License Number: 0434134 | |
License Date: 2011-06-07 | |
License Status: Issued | |
Spud Date: 2011-07-20 | |
Final Drill Date: 2011-08-08 | |
Well Total Depth: 2330.00 m | |
Surface Hole Latitude: 49.966808 | |
Surface Hole Longitude: -112.735410 |
Date | Event |
---|---|
2011-06-07 | Obtained License |
2011-07-20 | Well Log Performed |
2011-07-21 | Surface Casing Operation Performed |
2011-07-21 | Well Log Performed |
2011-07-22 | Direction Drilling Operation Performed - Horizontal |
2011-07-24 | Intermediate Casing Operation Performed |
2011-08-08 | Finished Drilling |
2011-08-08 | Well Mode changed to Drilled and Cased |
2011-08-09 | Well Log Performed |
2011-08-10 | Liner Casing Operation Performed |
2011-08-12 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-12 | Rig Released |
2011-08-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-05 | Perforation Treatment Performed - Jet Perforation |
2011-09-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-01 | Well Began Production |
2011-11-01 | Well Fluid changed to Crude Oil |
2011-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-22 | 685.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-12 | Open Hole/Barefoot Completion | 2142.50 | 2300.00 | 0 |
2011-08-31 | Multi-Stage Fracture | 1276.30 | 1276.70 | 0 |
2011-09-05 | Perforation | 1150.00 | 1152.00 | 20 |
2011-09-07 | Multi-Stage Fracture | 1150.00 | 1152.00 | 0 |
2011-08-31 | Multi-Stage Fracture | 2075.30 | 2075.70 | 0 |
2011-08-31 | Multi-Stage Fracture | 1974.80 | 1975.20 | 0 |
2011-08-31 | Multi-Stage Fracture | 1874.40 | 1874.80 | 0 |
2011-08-31 | Multi-Stage Fracture | 1774.00 | 1774.40 | 0 |
2011-08-31 | Multi-Stage Fracture | 1678.20 | 1678.60 | 0 |
2011-08-31 | Multi-Stage Fracture | 1577.70 | 1578.10 | 0 |
2011-08-31 | Multi-Stage Fracture | 1477.20 | 1477.60 | 0 |
2011-08-31 | Multi-Stage Fracture | 1376.70 | 1377.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1293 | 0.0 | 0.0 | 0.0 |
2012 | 8479 | 0.0 | 0.0 | 0.0 |
2013 | 8492 | 0.0 | 0.0 | 0.0 |
2014 | 8588 | 0.0 | 0.0 | 0.0 |
2015 | 8747 | 0.0 | 0.0 | 0.0 |
2016 | 8567 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8545 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]