X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124191314002

Well Details

Well ID: 0124191314002
Loading map...
Location: 00/14-13-012-19W4/2
Location Alias: 00/14-13-12-19 W4M
Location Alias 2: 00/14-13-012-19 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 19
Section: 13
County/Municipality: Lethbridge County
Well Name: SLE RETLAW 14-13-12-19
Operator Name: SanLing Energy Ltd.
License Number: 0050234
License Date: 1974-06-24
License Status: Suspension
Spud Date: 1974-06-27
Final Drill Date: 1974-07-04
Well Total Depth: 1109.50 m
Surface Hole Latitude: 50.002684
Surface Hole Longitude: -112.476145

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-24 Obtained License
1974-07-02 Blow Occurred
1974-07-04 Finished Drilling
1974-07-04 Well Mode changed to Drilled and Cased
1974-07-05 Drill Stem Test Performed
1974-07-06 Production Casing Operation Performed
1974-07-20 Perforation Treatment Performed - Jet Perforation
1974-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-11-08 Perforation Treatment Performed - Jet Perforation
1975-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-02-21 Perforation Treatment Performed - Jet Perforation
1975-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-02-25 Perforation Treatment Performed - Cement Squeeze
1976-06-15 Perforation Treatment Performed - Jet Perforation
1976-08-01 Well Began Production
1976-08-01 Well Fluid changed to Gas
1976-08-01 Well Mode changed to Flowing
1986-05-13 Well Log Performed
2007-02-16 Well Log Performed
2008-10-01 Well Fluid changed to Gas
2008-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-07-20 Perforation 1092.40 1095.50 7
1974-11-07 Packing Device Capped w/Cement 1082.00 1089.70 0
1974-11-08 Perforation 1065.30 1070.80 7
1975-02-18 Packing Device Capped w/Cement 1021.10 1028.70 0
1975-02-21 Perforation 996.70 1004.30 7
1975-02-22 Acid Treatment 996.70 1004.30 0
1975-02-25 Cement Squeeze 996.70 1004.30 0
1976-06-15 Perforation 1065.30 1070.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3118 0.0 0.0 0.0
1977 7696 0.0 0.0 0.0
1978 6729 0.0 0.0 0.0
1979 5986 0.0 0.0 0.0
1980 7965 0.0 0.0 0.0
1981 6119 0.0 0.0 0.0
1982 6664 0.0 0.0 0.0
1983 7904 0.0 0.0 0.0
1984 8378 0.0 0.0 0.0
1985 7363 0.0 0.0 0.0
1986 7547 0.0 0.0 0.0
1987 8498 0.0 0.0 0.0
1988 7972 0.0 0.0 0.0
1989 7124 0.0 0.0 0.0
1990 7867 0.0 0.0 0.0
1991 8282 0.0 0.0 0.0
1992 8141 0.0 0.0 0.0
1993 8566 0.0 0.0 0.0
1994 7146 0.0 0.0 0.0
1995 7996 0.0 0.0 0.0
1996 8298 0.0 0.0 0.0
1997 8463 0.0 0.0 0.0
1998 8173 0.0 0.0 0.0
1999 8448 0.0 0.0 0.0
2000 8288 0.0 0.0 0.0
2001 8478 0.0 0.0 0.0
2002 8232 0.0 0.0 0.0
2003 8199 0.0 0.0 0.0
2004 8243 0.0 0.0 0.0
2005 8328 0.0 0.0 0.0
2006 8310 0.0 0.0 0.0
2007 1502 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-07-02 Blow 1085.00 1085.00

For data sources see[6]

References