X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124182704000

Well Details

Well ID: 0124182704000
Loading map...
Location: 00/04-27-012-18W4/0
Location Alias: 00/04-27-12-18 W4M
Location Alias 2: 00/04-27-012-18 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 18
Section: 27
County/Municipality: Municipal District of Taber
Well Name: SLE RETLAW 4-27-12-18
Operator Name: SanLing Energy Ltd.
License Number: 0083263
License Date: 1980-06-05
License Status: Suspension
Spud Date: 1980-07-25
Final Drill Date: 1980-08-03
Well Total Depth: 1134.00 m
Surface Hole Latitude: 50.021763
Surface Hole Longitude: -112.388608

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-05 Obtained License
1980-08-03 Finished Drilling
1980-08-03 Well Mode changed to Drilled and Cased
1980-08-04 Drill Stem Test Performed
1980-08-04 Well Log Performed
1980-08-05 Drill Stem Test Performed
1980-08-06 Production Casing Operation Performed
1980-10-15 Perforation Treatment Performed - Jet Perforation
1980-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-25 Perforation Treatment Performed - Jet Perforation
1981-02-16 Perforation Treatment Performed - Fractured
1981-03-01 Well Began Production
1981-03-01 Well Fluid changed to Crude Oil
1981-03-01 Well Mode changed to Flowing
1990-04-01 Well Fluid changed to Crude Oil
1990-04-01 Well Mode changed to Suspended
1990-11-20 Well Fluid changed to Crude Oil
1990-11-20 Well Mode changed to Pumping
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Suspended
2008-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-25 Plug Back Performed
2008-01-25 Well Fluid changed to Crude Oil
2008-01-25 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-15 Perforation 1104.50 1105.50 7
1980-10-25 Packing Device Capped w/Cement 1095.00 1095.00 0
1980-10-25 Perforation 1071.00 1074.00 7
1981-02-16 Fracture 1071.00 1074.00 0
2008-01-25 Packing Device Capped w/Cement 1059.00 1067.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 6824 0.0 0.0 0.0
1982 4885 0.0 0.0 0.0
1983 1773 0.0 0.0 0.0
1990 765 0.0 0.0 0.0
1991 8061 0.0 0.0 0.0
1992 8228 0.0 0.0 0.0
1993 6979 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 5094 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-01-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References